CI-2009 EAp2:Minimum Energy Performanceposted by Sarah Simchuk on
I'm attempting to register the energy star equipment for my project under Table EAp2-4. The table asks for Rated Power in WATTS.
Rated power
CI-2009 EAp2:Minimum Energy Performanceposted by Yaser Al Sharif on
From where can i take rated power for equipments like laptop , i read it on laptop about 55wh then i divded it by work hours give me 6.7watt , is that right ??????
M&V approach case 2 (75% or more of total building area)
CI-2009 EAc3:Measurement and Verificationposted by Gaston Michaud on
We were trying to pursue this credit by developing and implementing a M&V plan following option C from the IPMVP, but after reading some comments, it seems that this path was removed.
Clarification
CI-2009 EAc3:Measurement and Verificationposted by Redy Truccolo on
Hi Marcus, We've a LEED CS certified building in which the Tenant will occupy almost 100% of the total area, so we will fall in CASE 2. We obtained the CS certification EAc5.2 credit and we've sub
Where to find the Ecologo-certified products?
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Helen Samuel on
Now that Ecologo was acquired by UL, where can I find which products are Ecologo-certified?
Molok Containers for MRp1
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Kristopher Lashley on
We are looking to install a 5000L Molok recycling bin for a LEED 2009 CS building that will be a restaurant. According to the reference guide a 11.6m recycling area would be required.
EV Ready acceptable?
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Dylan Connelly on
For Core & Shell projects - is installing 3% of the parking stalls to be EV ready acceptable to achieve these points?
EAc5 Option 3
NC-2009 EAc5:Measurement and Verificationposted by Sheryl Swartzle on
Our client chose Option 2 on the PIf1 and the form has been approved. They have decided to pursue the 1 point available in EAc5 for choosing Option 1 in PIf1.
Modeling of CHP
CS-2009 EAp2:Minimum Energy Performanceposted by MARCIO OROFINO on
I am working in a project that had a previous consultant and we do not agree with the way the CHP shall be modeled.
Tools for demonstrating solar orientation
Homes-v2008 IDc1:Integrated project planningposted by Erica Downs on
Is anyone aware of any tools for demonstrating the east-west axis of the house is within 15 degrees of due east-west? Or do I need to bust out my protractor?