Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Cleaners

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Pia Öhrling  on 

Should a cleaner used before the adhesive (to make the Surface clean) fullfill IEQc4.1? If it should which category should be used?

2
Sat May 23, 2015, 12:29 am

Lead Paint

Schools-2009 SSp2:Environmental Site Assessment
posted by  Adam Musante  on 

Generally speaking, is the presence of lead paint in an existing school from the 1950's cause for concern and must be addressed or else the prerequisite is not satisfied?

2
LFA, RESET ASP, WELL Faculty, LEED Fellow
Wight & Company
LEEDuser Expert
6 thumbs up
Fri May 22, 2015, 5:45 pm

Reclamation Land

ND-v2009 SLLp3:Wetland and water body conservation
posted by  WT Ho  on 

To stay "untouched" to water body, does it mean that a project with reclaimed portion is ineligible for ND, even if other potion of the future development land is previously developed? What if tha

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Fri May 22, 2015, 3:02 am

Thermal Comfort Survey

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Leed User  on 

I used the survey template provided on this site and was denied the credit saying it did not address all of the ASHRAE 55-2004 environmental variables (air speed, humidity, radiant temperature, and

5
Senior Sustainability Manager
YR&G
LEEDuser Basic Member
27 thumbs up
Thu May 21, 2015, 10:08 pm

Lease Agreement an option to comply with the credit requirements

CS-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Katherine Ann Resurreccion  on 

Hi, We are currently documenting the requirements for this credit and our option in order to comply is to provide a Tenant/Lease Agreement.

3
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu May 21, 2015, 5:18 pm

Process loads

NC-v4 EAc2:Optimize energy performance
posted by  Ake Larsson  on 

In our company, we have introduced LEED as mandatory for all new construction projects.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4459 thumbs up
Wed May 20, 2015, 9:45 pm

How long do you have to do surveys?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Parker williams  on 

How long do you have to do surveys? Is this suppose to be ongoing forever?

4
Default Avatar
Energy Engineer
7group
LEEDuser Basic Member
18 thumbs up
Wed May 20, 2015, 9:45 pm

EAp2-4: Energy Star equipment: conversion from kWa to Watts

CI-2009 EAp2:Minimum Energy Performance
posted by  Sarah Simchuk  on 

I'm attempting to register the energy star equipment for my project under Table EAp2-4. The table asks for Rated Power in WATTS.

4
Wed May 20, 2015, 6:14 pm

Rated power

CI-2009 EAp2:Minimum Energy Performance
posted by  Yaser Al Sharif  on 

From where can i take rated power for equipments like laptop , i read it on laptop about 55wh then i divded it by work hours give me 6.7watt , is that right ??????

4
Wed May 20, 2015, 4:51 pm

M&V approach case 2 (75% or more of total building area)

CI-2009 EAc3:Measurement and Verification
posted by  Gaston Michaud  on 

We were trying to pursue this credit by developing and implementing a M&V plan following option C from the IPMVP, but after reading some comments, it seems that this path was removed.

3
Wed May 20, 2015, 4:47 pm