Are exceptions mandatory or optional?

NC-2009 EAc1:Optimize Energy Performance
posted by  John Krutko  on 

Under ASHRAE 90.1 - G3.1.1 do I HAVE to use exception C for any zones having special pressurization relationships, cross contamination requirements, or code-required minimum circulation rates?

3
Default Avatar
Sr Project Manager
Osborn Engineering
LEEDuser Basic Member
1 thumbs up
Wed Apr 29, 2015, 1:23 pm

Fire suppression systems

NC-v4 EAc6:Enhanced refrigerant management
posted by  Jody Lee Potvin-Jones  on 

Hi, Are fire suppression systems and their OPD and GWP addressed by this credit?

3
Default Avatar
engineering manager
javac
LEEDuser Basic Member
0 thumbs up
Tue Apr 28, 2015, 8:39 pm

The vent calcs indicate a total area significantly lessthan Plf2

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Matt Dem  on 

Hi, Can please someone give his/her suggestion on the question I have below ? I received a comment for (Design Preliminary Submission) ventilation calculations indicate a total area (3,055 sqf)

5
Sr. Sustainability Consultant
Taitem Engineering
LEEDuser Basic Member
36 thumbs up
Tue Apr 28, 2015, 4:05 pm

Dining Halls

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Laura Charlier  on 

Does anyone have any experience earning compliance with this credit in a Dining Hall application?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Apr 28, 2015, 3:24 pm

Primers - really?

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Keith Robertson  on 

In my opinion, LEED 2009 incorrectly categorizes primers. I know that the table issued with the 4/14/10 addendum clearly lumps primers into the GS-11 requirements. This I don’t understand.

6
AIA, LEED Fellow
ChicagoGreen
LEEDuser Basic Member
3 thumbs up
Tue Apr 28, 2015, 9:42 am

Baseline landscape type

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  Charalampos Giannikopoulos  on 

For a project where turf grass area is replaced by native low-irrigation demanding planting would baseline landscape type include turf whereas design type include the new water efficient species?

2
LEED Fellow, WELL AP
JLL
LEEDuser Basic Member
125 thumbs up
Tue Apr 28, 2015, 7:20 am

preconsumer recycled content in steel

NC-2009 MRc4:Recycled Content
posted by  Osama Hassan  on 

How steel industries produce a waste that considered as a pre-consumer?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Tue Apr 28, 2015, 6:22 am

If the ventilation of kitchens in hotel should be included in

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Leanne Niu  on 

A hotel project that the kitchens have independent ventilation and outdoor air system , whether the ventilation of kitchens should be included in the calculation?

2
Tue Apr 28, 2015, 1:28 am

VOC content for Shop applied finishes

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by   Jeremy Mendenhall  on 

We are new to the Leed program and wanting to make sure that we are following all of the guidelines, we have received some instruction however I'm trying to get confirmation that shop applied fini

4
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Apr 27, 2015, 10:37 pm

Commingled Waste Diversion

EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additions
posted by  Michelle Rosenberger  on 

I see nothing in this credit that discusses commingled diversion methodologies or requires monthly diversion rate backup from facilities like the NC rating system.

4
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Mon Apr 27, 2015, 10:32 pm