Forum quick links
How to calculate the impact of a heat pump, only used for heatin
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Lise Dannesboe on
Hi! We use a heatpump system, which is used to supply heat as back-up solution.
LEED v3 CS Warehouse - MPR Minimum Occupancy Compliance
CS-2009 MPR5:Must comply with minimum occupancy ratesposted by SIG - Sustainability Main Account on
Has there been any previous experience submitting a LEED CS project under v3 with an empty warehouse design, not outfitted with an office and/or restroom to accommodate a FTE?
Hi all,
NC-2009 EAp2:Minimum Energy Performanceposted by Visu Boj on
I am working on a certification for a factory having less than 5 percent conditioned area. My process load is also high upto 75 percent.
Permanent Irrigation System, Temporary Use of Potable Water
NC-2009 WEc1:Water Efficient Landscapingposted by Daniel Costantino on
Hello, I am working on a project where there will be a permanent irrigation system.
Open Floor Plan with different Tvis Values
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Marisa Britton on
Can I do prescriptive method of calculation for an open floor plan if the N+W glazing walls of the building have a Tvis of 38% and the South + East glazing walls have a Tvis of 56%?
Future Expansion
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Karl Heitman on
Our project, an industrial manufacturing facility, is expecting future expansion, and it has been noted on our permit/construction drawings.
What is the acceptable testing standard for runoff coefficient.
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Panupant Phapant on
Dear All We are the construction materials manufacturers.
ASHRAE standard
NC-2009 EAp2:Minimum Energy Performanceposted by Nelina Loiselle on
Hello, Can someone let me know if ASHRAE 90.1 2010 is acceptable to use in relation to lighting or is 90.1 - 2007 still required to be used?
Baseline System Type for Hotels
NC-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
Hi, I am wondering what Baseline System Type should be used for hotels?
Fundamental Commissioning Rainwater Harvesting System...
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Rick Alfandre on
Our current project will have a rainwater containment system that will be connected to our domestic water supply to provide water for toilet flushing and irrigation.