Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Regularly Occupied Space

EBOM-2009 PIf3:Occupant and Usage Data
posted by  Saul Pichardo, AIA  on 

Hello, Where can I find information on what is considered "regularly occupied space" in a warehouse facility that has most of its space dedicated to product storage and much of the open area used

2
Sat Apr 11, 2015, 3:06 pm

Shade from trees outside of site

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Summer Gorder  on 

Can the shade from tree canopy include trees that are outside of the project boundary?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Sat Apr 11, 2015, 6:30 am

Doubling Area

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Karen Loysen  on 

A site has reflective pavement (SRI 29+) that is partially shaded by trees. Do I count that area as shaded and subtract it from the area of reflective pavement?

3
Fri Apr 10, 2015, 3:22 pm

Subtraction of utility's renewable energy sources from RECs?

NC-2009 EAc6:Green power
posted by  Erica Downs  on 

This may be a silly question, but I said I would ask... If we can document that XX% of our client's utility-provided electricity is from renewable sources (wind, hydro, solar), can they just purch

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4459 thumbs up
Thu Apr 9, 2015, 8:06 pm

Asphalt Paving Coatings?

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Nicole Kimoto  on 

The client has decided to proceed with providing new asphalt paving instead of concrete, but they are planning on providing a coating or thermoplastic paint over.

2
Sustainability Coordinator
Webcor Builders
LEEDuser Basic Member
40 thumbs up
Thu Apr 9, 2015, 6:43 pm

Partial Purchased Energy

NC-2009 EAp2:Minimum Energy Performance
posted by  Christopher Strunk  on 

Good afternoon. I'm getting started on a model for a county courthouse office expansion. In its pre-renovated state, the facility purchases both HW and CW through the local utility.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4459 thumbs up
Thu Apr 9, 2015, 5:51 pm

Pressure loss calculation

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Yaser Al Sharif  on 

We are registed for commercial interior rating system , the system installed in our project is vrv system, in order to comply with optimize energy performance EAC1.3 , critical path supply duct pre

3
Thu Apr 9, 2015, 3:41 pm

FSC Certified Plywood

NC-2009 MRc7:Certified Wood
posted by  Andy Prestridge  on 

I have a lot of plywood that is being used on the job that is supposed to be FSC Certified.

2
Default Avatar
Tahiti Cabinets Inc.
LEEDuser Basic Member
0 thumbs up
Thu Apr 9, 2015, 3:06 pm

Energy Modeling In a High bay Industrial area + Office

NC-2009 EAp2:Minimum Energy Performance
posted by  Marcelo Maciel de Santa Helena  on 

What’s the best way to proceed with the energy model of the following case? The building is a 4000m² manufacturing building where there is a small office area and a large high bay industrial area.

7
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4459 thumbs up
Thu Apr 9, 2015, 2:11 pm

MRpc69 - easily achieved, but not always

Pilot-Credits MRpc69:Construction and demolition waste management
posted by  Laura Charlier  on 

We registered for this credit for one than one project under the thought that it would be easy to achieve. We were right...for one of the projects.

4
Sustainability Project Manager
Atkins
LEEDuser Basic Member
59 thumbs up
Thu Apr 9, 2015, 9:57 am