Water Chiller and relative Pumps-System 8
NC-2009 EAp2:Minimum Energy Performanceposted by Giuseppina Amorusi on
Dear All, I’m modelling a water centrifugal chiller in System 8 of ASHRAE 90.1 (Appendix G), using HAP by Carrier. I have to need how calculate the minimum entering condenser water temperature (ECW
Reuse of envelope but not structural floor
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Alfred Servodidio on
I am working on 14,000sq ft 8 story historic high profile project in NYC that is keeping almost 100% of the exterior skin and framing but is removing almost all of the structural floor and roof dec
Energy Modelling Issues
NC-2009 EAp2:Minimum Energy Performanceposted by Cynthia Estrada on
I am project admin for a V3-2009 NC project and wondered if anyone had issues with energy modeling software and accuracy of results with complicated/unique systems?
Addition to existing building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Kasandra Martin on
We are building an addition to an existing non-LEED building and only adding a wall in the existing building. Originally we were going for LEED v2009 NC and now switched to EBOM.
seashells considered recycled content?
CI-2009 MRc4:Recycled Contentposted by Dan Governile on
Can anyone tell me if seashells can be a recycled content in the manufacture of cement terrazzo countertops?
Rated Cooling Capacity for Commercial Refrigeration Equipment
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Wei Jiang on
We have a project that has many commercial refrigeration equipment such as walk-in coolers and feezers in commercial kitchens.
BREEAM as the certification scheme
ND-v2009 GIBp1:Certified green buildingposted by Tanja Arnesson on
Hi, We are looking into a LEED ND project where we are having problems with applying LEED NC for a shopping centre since the building is attached to two others building.
Ancillary site buildings
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Erin Holdenried on
Are unoccupied ancillary site buildings included in the credit? Or SSc7.2? Thanks for your feedback!
Basic Services Provided by the Client
NC-2009 SSc2:Development Density and Community Connectivityposted by Keerthi Ratnayake on
We have purchased an old factory and currently renovating the buildings to accommodate 2,000 workers.
EA p2
NC-2009 EAp2:Minimum Energy Performanceposted by John Lee on
I haven't energy modeled yet and am reviewing someone else's work on EAp2.