Outpatient Water use
Healthcare-v2009 WEp1:Water use reductionposted by Maya Karkour on
Hi, I noticed in the WEp1 LEED online form that outpatients fixture group have zero use of Flush and Flow fixtures by default! Is it OK to keep it as zero water use for outpatients, or you would re
Option 2 -question regargind baseline/budget building-
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Gustav Alfaro on
Hi to all: On regards Option 2, the Reference Guide is clear about the thresholds that must be achieved as HVAC systems annual cost savings, but it is not clear if those savings can be boosted by
Batteries - annual actual diversion performance verification
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Jean Marais on
Does anybody have a practicle way in which they "verify" their performance for Battery diversions? In the EU it is law to seperately dispose of batteries.
revising LEED boundary on old project (LEED NCv2.2)
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Courtney Royal on
This project is a park project in NYC. The original completed bid set was issued in 2009, and the LEED boundary did not include parking or additional infrastructure.
Walk-off mats
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Firstly, a happy New Year to each and every one of you. My question is about 3 walk-off mats located at the entrance of the building. Are mats concerned with COV requirement ?
Medical Center MRI, CT Scan Rooms
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Sara Zoumbaris on
Although the October 2013 Matrix, does not allow any patient rooms to be without daylighting/ views, I believe these rooms could be eliminated due to the nature of their process.
Microfiber cleaning
EBOM-v4 EQc7:Green cleaning - products and materialsposted by Louise Taillon on
are microfiber cleaning cloths, pads, tools included in the calculation for cleaning products and materials? Where does the use of microfiber fit-in to the green cleaning policy?
Regularly occupied space
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Michael Beattie on
The existing building renovation I'm working on has several pathways from door to stairway, through the open office environment.
Irrigation area
NC-2009 WEc1:Water Efficient Landscapingposted by Alicja Bieszyńska on
If my project consists of 10,000sf of greenery but only 3,000sf is irrigated, do I need to insert 10,000sf or 3,000sf as a total area in the LEED Online form (both baseline and design case)?
regularly occupied zones
NC-2009 IEQp1:Minimum IAQ Performanceposted by Stella Stella on
Do we need to include spaces such as corridors, store rooms when computing the outdoor air requirement using the 62MZCalc ? Or do we include only regularly occupied zones in the calculation?