Forum quick links
Link to the v4 Water Calculator
NC-v4 WEp2:Indoor water use reductionposted by Dylan Connelly on
http://www.usgbc.org/resources/indoor-water-use-calculator
Can Janitor closet be tied to restroom exhaust
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Leticia SooHoo on
Hello, we are working on a commercial office building project. We are intending to meet the requirements of IEQc5 by providing exhaust to the janitor closets.
ANSI/BIFMA Testing Date vs Manufacture Date
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Nicole Schuster on
This credit requires that the manufacturing period must be within the certification period.
EAp2 Online form - Table EAp2-1. Space Usage Type -
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, There is a clarification question associated with a reviewer's remark. From the modeling software (Trace 700) reports, the spaces are divided to Regularly occupied and Unconditioned (as
Retail Loading docks
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Sunayana Jain on
According to LEED for Retail, "employ permanent entryways systems for all entrances including back-of-house areas such as loading docks or service areas." In my case loading docks will only used f
Supplemental Table 1.4 - reviewers comment
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, I've received a comment from a reviewer, that insufficient info regarding VAV reheat terminal units are provided in this table.
Views from a single occupancy dorm/bed room
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Nelina Loiselle on
Hello, I am working on a dorm project that has some single occupancy bed rooms with access to views.
Handicap Access
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Mary Grace Wong on
Our building has a separate main entrance and handicap access (which includes an elevator to travel between street level and lobby vertically).
Column Veneer preserved but covered
NC-2009 MRc2:Construction Waste Managementposted by Madhura Dhayagude on
We are working on a project where the client wants to preserve the existing column veneer, however they want to cover the whole column with a new finish.
Option 2 Simulation
NC-v4 EQc7:Daylightposted by Charalampos Giannikopoulos on
For Option 2 (Simulation) is it accepted to run the simulation for 9.00 and 15.00 on September 21 only, or should it be repeated for March 21st and get the average of both?