Forum quick links
Wind renewable energy- Green Powert
NC-2009 EAc6:Green powerposted by Ramesh Narayanan on
One of our client has already own the wind turbine for 100% of the buildings electricity. They want to show that wind turbine power to meet the LEED requirement.
Modeling Heat Reclaim in EAp2 v2009
NC-2009 EAp2:Minimum Energy Performanceposted by Mario S. on
Hello, We are working on a project that uses heat reclaim as a source of energy for service hot water.
Landscaped area included or only irrigated landscape areas?
NC-2009 WEc1:Water Efficient Landscapingposted by Kevin Gilleran on
Are all landscaped areas within the LEED project boundary included in the calculations for this credit or just irrigated landscaped areas?
WaterSense Labeled Products
NC-v4 WEp2:Indoor water use reductionposted by Mark Zoeteman on
Reference Guide indicates WaterSense label requirements are mandatory in U.S.
Natural ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gaston Michaud on
We are working on a residential core and shell project, and we are having some issues with the compliance of ASHRAE 62-1 ventilation requirements. Basically, the building has apartments on each lon
agricultural site, previously graded?
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Mónika Egyed on
Hi, the project of ours has a site with current agricultural use, there is only 1-2% of the site with native vegetation. In this case, can we use Option 2 - previously developed or graded?
Speciality
EBOM-v4 INc2:LEED Accredited Professionalposted by Ralf Lehmann on
Is a LEED AP BD+C also eligible for earning the credit under EBOM?
Rubber Wall Base and Carpet Cushion outside US
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Lise Dannesboe on
Hej! Our project is placed outside US and we would like to pursue credit IEQ 4.3. For most of the floor materials AgBB as European alternative is ok to document compliance with this credit.
Demand Control Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
Further, to the preliminary review of EAp2 our project team got a comment with regard to demand control ventilation (DCV).
MR C2: Option 2
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Jessica McNaughton on
Are there any programs that are currently "USGBC Approved" under multi-attribute optimization?