District Energy Systems-Chilled Water

EBOM-2009 WEc1:Water Performance Measurement
posted by  Alexa Stone  on 

How does DES and purchasing of chilled water from utility fall into this credit? The guidance from the LEED DES document does not cover WE credits. Thank you!

4
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Mon May 19, 2014, 4:02 pm

VOC budget shortcut

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Nick Shaffer  on 

Is there an interpretation or language in the reference guide I am missing to support the statement above of "Is there a shortcut to the VOC budget method if you have just one product that is used

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon May 19, 2014, 4:02 pm

FTE calculation for gallery space

NC-2009 PIf3:Occupant and Usage Data
posted by  Ilya Zavaleev  on 

I have a mixed used core and shell building with the following space types: - Retail - Office - Large gallery in the middle of the bulding which works as a main entrance to the large campus develop

2
Default Avatar
Sustainability Consultant
Dagher Engineering
LEEDuser Basic Member
51 thumbs up
Sun May 18, 2014, 5:32 pm

IEQ 4.3 LEED Online Form Drop Down menu for adhesives

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Gina Dennis  on 

We are uploading to LEED Online using a Beta form "v.0.2.3" in the IEQ 4.3 Form. IEQ 4.3 requires us to list the adhesives (from IEQ 4.1) used for the flooring.

2
Fri May 16, 2014, 7:31 pm

Becomming LEED AP BD+C during LEED project

NC-2009 IDc2:LEED Accredited Professional
posted by  Roger Moquin  on 

I, Is it ok for LEED IDc2 if i become LEED AP BD+C just before the start of the project or late in the project. I am the administrator of the project. Thank you.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri May 16, 2014, 3:52 pm

Can a Graded Pad Site Meet SSp1?

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Michael Hoffner  on 

Our client has purchased a graded pad site from a developer and wants to build a LEED certified project.

6
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri May 16, 2014, 2:29 am

Smoking on balconies in residential and hospitality projects

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Heather DeGrella  on 

LEEDuser states that a project should ask itself "Will smoking be prohibited on all areas of balconies and decks, even for private residences and hotel rooms, that are within 25 feet of entries, o

7
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Thu May 15, 2014, 5:41 pm

Choosing an HVAC system baseline for a Manufacturing Facility

NC-2009 EAp2:Minimum Energy Performance
posted by  Ashwin Kumar  on 

We are working on a manufacturing facility for which we are trying to choose the accurate HVAC baseline system for energy modelling. According to ASHRAE 90.1 2007 Table G.3.1.1A, looking at our co

3
Default Avatar
Sustainability Services Consultant
M+W Group
LEEDuser Basic Member
2 thumbs up
Thu May 15, 2014, 1:25 pm

Unoccupied Building

Data-Centers-NC-v4 MPR3:Must comply with project size requirements
posted by  Phillip Cook  on 

I am working on a datacentre that does not include any occupied areas and will have no regular staff on site - security and network support will be provided from an adjoining site.

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed May 14, 2014, 11:42 pm

Trash can liner credit EBOM V4

Retail-EBOM-v4 EQc7:Green cleaning - products and materials
posted by  Marion Stecklow  on 

What is the credit requirement for trash can liners in EBOM v4?