Becomming LEED AP BD+C during LEED project
NC-2009 IDc2:LEED Accredited Professionalposted by Roger Moquin on
I, Is it ok for LEED IDc2 if i become LEED AP BD+C just before the start of the project or late in the project. I am the administrator of the project. Thank you.
Can a Graded Pad Site Meet SSp1?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Michael Hoffner on
Our client has purchased a graded pad site from a developer and wants to build a LEED certified project.
Smoking on balconies in residential and hospitality projects
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Heather DeGrella on
LEEDuser states that a project should ask itself "Will smoking be prohibited on all areas of balconies and decks, even for private residences and hotel rooms, that are within 25 feet of entries, o
Choosing an HVAC system baseline for a Manufacturing Facility
NC-2009 EAp2:Minimum Energy Performanceposted by Ashwin Kumar on
We are working on a manufacturing facility for which we are trying to choose the accurate HVAC baseline system for energy modelling. According to ASHRAE 90.1 2007 Table G.3.1.1A, looking at our co
Unoccupied Building
Data-Centers-NC-v4 MPR3:Must comply with project size requirementsposted by Phillip Cook on
I am working on a datacentre that does not include any occupied areas and will have no regular staff on site - security and network support will be provided from an adjoining site.
Trash can liner credit EBOM V4
Retail-EBOM-v4 EQc7:Green cleaning - products and materialsposted by Marion Stecklow on
What is the credit requirement for trash can liners in EBOM v4?
EMICODE - EC1 / EC1Plus
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Michael Smithing on
Does anyone have experience with products tested and licensed under the German EMICODE VOC rating system? EC1 specifieds a maximum of 1000 micrograms/m3 (1 gram/liter) emission after three days.
Separated phase
NC-2009 IEQp1:Minimum IAQ Performanceposted by Valentin Grimaud on
My project is in design mid-review period, the reviewer gave a comment on IEQp1 which could be simplied as: “The total project area that is provided outdoor air is 10000 square meters (7000m2 for P
template update
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Tristan Roberts on
LEEDuser has updated our IPM template that is available to members in the Documentation Toolkit above.
Two-year contracts
NC-2009 EAc6:Green powerposted by Kath Williams on
Seems like this question must have been asked before but I can't find the answer.