Potable water backup
NC-2009 WEc1:Water Efficient Landscapingposted by Heather Holdridge on
Can a project still earn 4 points under option 2 if a cistern has potable water backup? Could we demonstrate that it wouldn't be used through the path 1 calculations?
Do all units have to run at 100% OA for this credit?
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Saju Varghese on
We have 4 A/C Units providing air conditioning to a building, two of them are 100% OA units and two of them are providing the total air supply cfm (OA + recirulated air) is 7000 cfm and 8600 respec
RH control with dew point control logic for IEQ 6.2
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by J I on
This project is based in highly humid place, we have used dew point control logic for AHU control. In this control logic, we are controlling 2-way chilled water valve from signal from supply air
Control Via Software Platform
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Andrew Gil on
Hello All, An unfortunate error was made when “multi-occupant space” was assumed by a team member to include a shared office space, and construction is complete.
Elevators (Lift/Escalators) & LEED EAC1 credit
Schools-2009 EAc1:Optimize Energy Performanceposted by Ameet AA on
Can I include the Elevators (Lift/Escalators) in EAC1 credit calculation using the whole building simulation method? I was told by an Elevator supplier that Regenerative Converter in lift could be
Polluted well water use
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Magda Aghababyan on
Dear all, We have a project that uses water from a polluted well for toilet flushing. The water is of low quality and is not drinkable.
Walking path through another building
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Heather DeGrella on
Our project is on a University campus but is not using the campus approach. University students cut through other campus buildings frequently.
furnitures installed before the flush out
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Benjie Herrera on
Can furnitures be installed before the flush out?
VOC testing method
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Ralph Bicknese on
Does GBCI require a certain testing method for VOC compliance?
Path 2: Storm Water Quantity Control - Discharge into Estuary
CI-2009 SSc1:Site Selectionposted by Gail Williams on
Hello, We are working on a project in Ireland where the surface water runoff from the site flows directly into a tidal reach (estuary) without attenuation, as this has been confirmed to be the mo