How can we get feedback on the pilot credit?
Pilot-Credits SSpc82:Local food productionposted by Heather DeGrella on
I am wondering if anyone who has posted has been able to get feedback any other way? I tried submitting my same question via LEEDonline and have received no response.
Fixture Replacement
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Patrick Salmon on
Our project will be pursuing the thirty percent (30%) savings threshold by including fixtures both within and outside the LEED project boundary.
LEED Interpretation 10372
NC-2009 MRc7:Certified Woodposted by Tristan Roberts on
I don't think the policy it gives is anything new—a lot of us have worked to choose to report wood content as either recycled or FSC, but not both—but FYI, LEED Interpretation 10372 was released on
Pressure Drop adustment in Section 14 Tables
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Actually I'am not able to correlate section 14 required inputs under pressure drop column "CFMd", and the requirements of ASHRAE TABLE 6.5.3.1.1 B in (pascals/ in.w).
Option 3 Under LEED ND V4
ND-v2009 SLLc2:Brownfields redevelopmentposted by Martine Desbois on
Could you please explain that Option. I am not sure I understand when it is applicable. Thank you OPTION 3.
Clarification on prescriptive option skylight/floor area ratio
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Jason Levine on
We are in the process of completing the spreadsheet for credit IEQ 8.1 for a NC project. Kalwall skylights are being used, in addition to Solatube 330 DS daylighting systems.
Spaces left for future use should be simulated as conditionned?
NC-2009 EAp2:Minimum Energy Performanceposted by Valentin Grimaud on
Dear community, I have a project where some spaces will be left for future use, while most of others are designed and built for immediate use.
Audio Visual Equipment part of prerequisite?
CI-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Does audio visual equipment need to be included into the appliances requirements including projectors, speakers, led display, interactive displays, etc?
LEED baundary
CS-2009 PIf1:Minimum Program Requirementsposted by gabriel Morales on
Our project is located in an area with 3 additional towers (one residential offices and 2), the parking lot of our office tower with LEED certification, has its parking in basements 3, 4 and 5, whi
Carpet tile approved as acceptable walk-off mat
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Melissa Vernon on
Carpet tile is now an acceptable entryway system per LEED Interpretation Ruling ID#10252 https://www.usgbc.org/leedinterpretations/LISearch.aspx?liaccessid=10252 Carpet tile is a highly desired w