Forum quick links
Existing Office Building not part of the contract
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Xavier Valladares on
Dear LEED User Team.
Performance period for leakage rate
EBOM-2009 EAc5:Enhanced Refrigerant Managementposted by American University on
I'm wondering what performance period would be acceptable for calculating the leakage rate (lbs of refrigerant added and over what time frame) for this credit.
Future HVAC Installation
CS-2009 EAp3:Fundamental Refrigerant Managementposted by Curt Pascoe on
What if your CS building scope does not include HVAC equipment (and therefore no refrigerants)? USGBC requires the entire building to meet this prereq (including tenant spaces).
MPR 6
CI-2009 EAc3:Measurement and Verificationposted by Adrienn Gelesz on
I have tried to figure out but cannot wrap my head around another subject. MPR 6 requires sharing actual whole-project energy and water usage data for a period of at least 5 years.
Rainwater Management in Colorado
EBOM-v4 SSc2:Rainwater managementposted by Jonathan Miller on
Does anyone know what the rules are on engaging in rainwater management in Colorado? I'm under the impression that this is against the law in the state.
Exterior covered spaces
NC-2009 PIf2:Project Summary Detailsposted by Esmeralda Ward on
Hello, Could someone please clarify where exterior hardscape spaces that are covered by the building roof should be counted?
Definition of a bicycle rack?
Retail-NC-v2009 SSc4:Alternative transportationposted by Ward Miller on
This may sound silly to most that have not had materials reviewed by GBCI, but how exactly is a bicycle rack defined? One rack can serve 1 or 10+ bicycles.
Calculations in the Letter Template
Schools-2009 SSc9:Site Master Planposted by Lauren Sparandara on
Hello, I understand that we have to meet the credits in the current submission and also show that we comply as a master site. However, I am confused about what goes into the actual Template.
MRc5 Option 2 - Direct miles or Nautical Miles?
NC-2009 MRc5:Regional Materialsposted by Jenelle Shapiro on
When using MRc5 Option 2 approach --> should we be using the direct distance between two locations? Or the nautical miles between two locations?
True Open Office
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by David Edenburn on
We have a space about 5000 ft2 for about 160 people. It is a true open office; no cubicles, no walls, just long rows of tables & chairs.