NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Oleg Petryuchenko on
if we have manufacturing equipment on the floor and all area is daylit through skylights, providing even lighting level across the space do we need to exclude sq.
Number of cycles
EBOM-v4 WEc3:Cooling tower water useposted by Jonathan Miller on
What is the number of cycles necessary to achieve 1 point? 10?
Scope of EAp2 we must include to meet the compliance
CI-2009 EAp2:Minimum Energy Performanceposted by Takayuki Hirota on
We are planning to renovate an existing building which is used as an office, aiming for LEED CI certification.
MERV for Filters
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Farah A. on
Are MERV 13 filtration media used for temporary or permanent air handlers?
LEED BD+C Question- Individual Thermal Comfort Controls
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Farah A. on
A project design team has design their new office space with an open office plan and operable windows to provide natural ventilation.
FSC Certified Wood
NC-2009 MRc7:Certified Woodposted by Farah A. on
I have another ques. regarding Certified Wood- Which of the following FSC products can count towards the Certified Wood criteria ?
COC requirements
NC-2009 MRc7:Certified Woodposted by Farah A. on
Which of the following pieces of documentation are required to demonstrate compliance with MR Credit 7 Certified Wood?
Innovation in Design
NC-2009 IDc1:Innovation in Designposted by Farah A. on
A project team earns an Innovation in Design point for an innovative strategy on a previous project.
No process water use
Healthcare-v2009 WEp1:Water use reductionposted by yanghee pierce on
I am working on an outpatient clinic project that doesn’t have any equipment as listed in Table 2.
One RTU not qualifying the prescriptive requirements
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Sunayana Jain on
Hi, I am working on a LEED CI project in which HVAC equipments (serving tenant space) are not being replaced ( 5 RTU units), one of the RTU unit is very old and does not qualify Efficiency requirem