Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

equipment

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Oleg Petryuchenko  on 

if we have manufacturing equipment on the floor and all area is daylit through skylights, providing even lighting level across the space do we need to exclude sq.

8
Director of Sustainability
DBR Engineering Consultants
LEEDuser Basic Member
244 thumbs up
Wed Feb 19, 2014, 8:30 pm

Number of cycles

EBOM-v4 WEc3:Cooling tower water use
posted by  Jonathan Miller  on 

What is the number of cycles necessary to achieve 1 point? 10?

6
Technical Director, LEED
USGBC
LEEDuser Expert
225 thumbs up
Wed Feb 19, 2014, 3:51 pm

Scope of EAp2 we must include to meet the compliance

CI-2009 EAp2:Minimum Energy Performance
posted by  Takayuki Hirota  on 

We are planning to renovate an existing building which is used as an office, aiming for LEED CI certification.

6
Wed Feb 19, 2014, 11:22 am

MERV for Filters

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Farah A.  on 

Are MERV 13 filtration media used for temporary or permanent air handlers?

3
Default Avatar
LEEDuser Basic Member
7 thumbs up
Tue Feb 18, 2014, 6:25 pm

LEED BD+C Question- Individual Thermal Comfort Controls

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Farah A.  on 

A project design team has design their new office space with an open office plan and operable windows to provide natural ventilation.

4
Default Avatar
LEEDuser Basic Member
7 thumbs up
Tue Feb 18, 2014, 3:24 pm

FSC Certified Wood

NC-2009 MRc7:Certified Wood
posted by  Farah A.  on 

I have another ques. regarding Certified Wood- Which of the following FSC products can count towards the Certified Wood criteria ?

6
Default Avatar
LEEDuser Basic Member
7 thumbs up
Mon Feb 17, 2014, 8:40 pm

COC requirements

NC-2009 MRc7:Certified Wood
posted by  Farah A.  on 

Which of the following pieces of documentation are required to demonstrate compliance with MR Credit 7 Certified Wood?

4
Default Avatar
LEEDuser Basic Member
7 thumbs up
Mon Feb 17, 2014, 8:16 pm

Innovation in Design

NC-2009 IDc1:Innovation in Design
posted by  Farah A.  on 

A project team earns an Innovation in Design point for an innovative strategy on a previous project.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Mon Feb 17, 2014, 7:48 pm

No process water use

Healthcare-v2009 WEp1:Water use reduction
posted by  yanghee pierce  on 

I am working on an outpatient clinic project that doesn’t have any equipment as listed in Table 2.

2
Executive Principal and Senior Wizard
TLC Engineering Solutions
LEEDuser Premium Member
62 thumbs up
Mon Feb 17, 2014, 7:48 pm

One RTU not qualifying the prescriptive requirements

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Sunayana Jain  on 

Hi, I am working on a LEED CI project in which HVAC equipments (serving tenant space) are not being replaced ( 5 RTU units), one of the RTU unit is very old and does not qualify Efficiency requirem

6
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Mon Feb 17, 2014, 6:54 pm