ASHRAE Standard 62.1–2010, Sections 4–7
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Jonathan Miller on
Can someone list the minimum requirements of ASHRAE Standard 62.1–2010, Sections 4–7? Thanks much.
Toilet Exhaust with Exhausted Air to Storage
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi, I'm working on a project for a deposit. On site there is a large exhaust fan on the roof.
Material Cost Calculation
NC-2009 MRc4:Recycled Contentposted by Loretta Maine on
I have a steel supplier who completed a very nice Material Reporting Form for me with a great breakdown of every one of the many products they provided for our project.
EPA Tools for Schools for IEQ c1.1
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Will Bianchi on
Our elementary school has adapted the EPA Tools for Schools Policy to address all components of indoor air quality. Tools for schools seems to cover the I-Beam criteria.
Brown Field redevelopement
NC-2009 SSc3:Brownfield Redevelopmentposted by Sahar Abi-Ziki on
Hello, Due to budget issues, our client wants to decontaminate a portion of the site and not the entire site (only the areas were we are doing interventions).
Submitting in excel format instead of filling out form
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Kathryn West on
Has anyone ever submitted an excel sheet for this credit in lieu of filling out the whole form.
Building Space Flushout
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Weld Morse on
I am working on a Massachusetts public works maintenance facility. it involves 2 separate structures; an office building and a garage.
On-site duct manufacture
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Mauricio Ramirez on
Hi. One of the projects in which I'm involved will have on-site HVAC duct manufacture. Does this practice has any inconvenient for the compliance with the credit IEQc3.1?
100% OA SYSTEM?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Weidong Luo on
an AHU with no return air supplies 100% OA to an office and a conference room with FCUs, the OA supply ducts connected to the FCU supply ducts.
Hexavalent Chromium on groundwater
NC-2009 SSc3:Brownfield Redevelopmentposted by eirini matsouki on
Hi all, Our project is international and is under construction. We are keeping this credit on a stand-by, as during the design submission there was not any evidence of contamination.