LEED boundary and pre-existing parking structure.

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michelle Oishi  on 

I've been looking through the forums and documentation and get some conflicting information. We're trying to establish an appropriate LEED project boundary for our project.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Tue Jan 28, 2014, 6:16 pm

LEED AP without speciality

ND-v2009 IDc2:LEED Accredited Professional
posted by  David ESPAGNET  on 

Dear Sir Or Madam, Can one of you confirm me if a LEED AP without speciality is eligible for this credit? Many thanks in advance

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Tue Jan 28, 2014, 5:57 pm

IEQc3.3 LEED EBOM 2009

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Teresa Farmer  on 

Do I need to submit the product purchase tracking sheet when submitting for this credit?

3
Default Avatar
Director of Sustainability and Training
Kelsan Inc
LEEDuser Basic Member
0 thumbs up
Tue Jan 28, 2014, 4:25 pm

EQc5 Negative Exhaust Rates

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Scott West  on 

I'm trying to figure out the exhaust airflow rates required for chemical pollutant source rooms in a hospital (e.g. janitor's closets, copy rooms, etc.).

5
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Mon Jan 27, 2014, 10:52 am

site selection C1

NC-2009 SSc1:Site Selection
posted by  Elisa Sequeros  on 

I would like to do the exam LEED AP and I have a very specific question : FOR A PREVIOUSLY UNDEVELOPED SITE, WHAT WATER BODIES DO NOT HAVE TO MEET THE 50-FOOT SETBACK CRITERIA TO COMPLY SUSTAINAB

2
Sustainable Building Consultant
Green Bridge Consulting
LEEDuser Expert
28 thumbs up
Mon Jan 27, 2014, 7:20 am

Entryway Grates and Mats

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  Elizabeth Felder  on 

The building has entryway grates a few feet in length in the vestibule of all building entrances.

4
Mon Jan 27, 2014, 2:17 am

PVC floor adhesive

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Valentin Grimaud  on 

Dear experts, we are purchasing the PVC floor adhesive, but i'm not sure which category is more suitable for this kind of adhesive in leedonline form, we considered "Rubber Flooring Adhesives" but

2
Sun Jan 26, 2014, 8:58 am

Outdoor Measurement Device location

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Carolina Vergnano  on 

We are working on a project that has a fancoil located on the top of the building that will treat the outdoor air and deliver it to each non densely occupied zone.

5
Sat Jan 25, 2014, 2:37 am

EQc3, EQc5 and filtration requirements

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Steve Loppnow  on 

I'd like to confirm that if a project is pursuing EQc5, that they must use MERV 13 filters for flush-out but can still use MERV 8 filters on equipment that is operated during construction.

7
Default Avatar
Systems Director
HOLOS
LEEDuser Basic Member
15 thumbs up
Sat Jan 25, 2014, 2:30 am

CSI Masterformat

NC-2009 MRc4:Recycled Content
posted by  K Nakamura  on 

We have a project that is using CSI MasterFormat 1995, instead of 2004.

5
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Jan 24, 2014, 4:15 pm