Warehouse Lighting -- Again

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Steve Samenski  on 

I've reviewed the threads on here and I see that warehouse lighting is discussed frequently.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Fri Dec 13, 2013, 10:52 pm

Definiition of building entrance

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Nate Maniktala  on 

What is the definition of 'building entrance'? If a canopy extends out 150ft from the actual door, can we could the canopy length? Or does the actual door dictate the distance? Thanks!

3
Fri Dec 13, 2013, 7:10 pm

LTc1. possible 18 points

CI-v4 LTc1:LEED for neighborhood development location
posted by  FRAGKISKOS LEVANTIS  on 

I do understand the logic behind giving a possible 18 points when locating in a LEED ND project. However, international projects, i.e.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri Dec 13, 2013, 7:04 pm
7
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu Dec 12, 2013, 10:46 pm

High Rise Residential - smoke detector/CO2 mon. combined device?

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Abena Darden  on 

Hi All -- I see my question might already be partially answered in the conversation from May 28, 2013.

11
Director of Operations
WorkingBuildings, LLC
LEEDuser Expert
39 thumbs up
Thu Dec 12, 2013, 6:37 pm

Campus DES Cx - LEED Submittal Requirements

NC-2009 EAc3:Enhanced Commissioning
posted by  Everardo Ocampo  on 

I'm working on a project at a Campus where an existing DES is being retro-commissioned. The DES will serve a new LEED building that is attempting to attain EA c3 (Enhanced Cx).

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Dec 12, 2013, 5:16 pm

Sound absorption coefficient data

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Monica Alicea  on 

Hello, We are working on filling out the Sound Absorption coefficient data in Table IEQp3-3.

2
Daniel Hicks, E.I., INCE
Geiler & Associates
LEEDuser Basic Member
175 thumbs up
Thu Dec 12, 2013, 2:51 pm

Naturally ventilated offices- mild temperate climate-loads unmet

NC-2009 EAp2:Minimum Energy Performance
posted by  Paul Overy  on 

We have a narrow plan 3 storey naturally ventilated building with radiators (baseboard) in temperate Ireland. Some windows are user controlled and some controlled by the BMS, with night purge.

5
Default Avatar
Overy+Associates
LEEDuser Basic Member
0 thumbs up
Wed Dec 11, 2013, 6:16 pm

Receptacle equipment in a Core&shell office building

CS-2009 EAp2:Minimum Energy Performance
posted by  Eleftherios Zacharakis  on 

When using Table G-C in User's Manual for ASHRAE Standard 90.1-2010 to define the receptacle equipment power density in an office building, shall I assume that even the Servers power density is inc

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4458 thumbs up
Wed Dec 11, 2013, 5:08 pm

MERV 13 requirement in tall buildings

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Bilge Ceylan  on 

I am working on a CI project which is in a tall building.

2
Wed Dec 11, 2013, 4:40 pm