Biodegradable Coconut Fiber Membrane

CI-2009 MRc6:Rapidly Renewable Materials
posted by  Guillermo Hernandez Espinoza  on 

Hello, I was wondering if you guys know if a Biodegradable Coconut Fiber Membrane commonly used for hydro seeding can be catalogued as a rapidly renewable material? Thanks in advance. Cheers.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Thu Dec 5, 2013, 9:21 pm

steel BOF and EAF

NC-2009 MRc4:Recycled Content
posted by  Courtney Royal  on 

A lot of steel manufactures are providing a "LEED" letter that includes both recycled content values for Electric Arc Furnance (EAF) and Basic Oxygen Furnance (BOF) method of producing steel.

12
Default Avatar
LEEDuser Expert
472 thumbs up
Tue Dec 3, 2013, 10:21 pm

Outdoor Preferential Parking for Handicapped

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Maya Karkour  on 

Hello, I am working on a project, in which all the parking lots are located underground except 3 preferential parking lots for handicapped, located next to the main entrance (outdoor).

2
Sustainability Coordinator
Webcor Builders
LEEDuser Basic Member
40 thumbs up
Tue Dec 3, 2013, 9:57 pm

Use of this credit on a LEED-NC or -SCH project?

CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishings
posted by  RETIRED   on 

Our team's interior designer is wondering if this credit can be utilized on a LEED-NC or -Schools project as an innovation credit.

2
LEED Project Reviewer, LEED AP BD+C, Senior LEED Specialist
Certifications Department Manager, Epsten Group, Inc.
LEEDuser Basic Member
26 thumbs up
Tue Dec 3, 2013, 7:20 pm

biofuel acquired from utility provider to serve CHP on site

NC-2009 EAc2:On-Site Renewable Energy
posted by  Doreen Kruschina  on 

Hi, we are working on a project that will implement a CHP unit serving a residential and a commercial development of which the commercial one being will be certified. Both projects are run by the s

3
Default Avatar
Doreen Kruschina Planung+Baumanagement
LEEDuser Basic Member
1 thumbs up
Tue Dec 3, 2013, 5:39 pm

Solar PV Field

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Jason Cocek  on 

Does anyone know how a field covered with solar panels would factor into the stormwater calculation?

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Tue Dec 3, 2013, 4:22 pm

Currently scoring 85%

CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spaces
posted by  Rebecca Hart  on 

Hi, I'd appreciate any tips or suggestions there may be from previous projects about how to score a few extra percentage points. We're currently on 85.5%, so close and yet it seems so far.

3
Tue Dec 3, 2013, 4:05 pm

LEED consultant as CxA?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Valentin Grimaud  on 

Dear all, A simple question: we are the LEED consultant for a project, which is larger than 50000sqft. But we are directly contracted by the Owner.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Dec 3, 2013, 4:03 pm

Off site stormwater handling

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Alicia Freire  on 

Can we obtain this credit for a site that already has natural drainage systems surrounding it, i.e. outside the site boundary? The water that falls on the site is taken care of in a natural way.

3
Default Avatar
Associate
hurleypalmerflatt
LEEDuser Basic Member
26 thumbs up
Tue Dec 3, 2013, 3:51 pm

green wall

NC-2009 WEc1:Water Efficient Landscaping
posted by  jorge calderon  on 

Hi, i like to know if green walls applies for this credit thank you in advance

5
Default Avatar
Sustainability Consultant
Dagher Engineering
LEEDuser Basic Member
51 thumbs up
Tue Dec 3, 2013, 3:38 pm