Forum quick links
Biodegradable Coconut Fiber Membrane
CI-2009 MRc6:Rapidly Renewable Materialsposted by Guillermo Hernandez Espinoza on
Hello, I was wondering if you guys know if a Biodegradable Coconut Fiber Membrane commonly used for hydro seeding can be catalogued as a rapidly renewable material? Thanks in advance. Cheers.
steel BOF and EAF
NC-2009 MRc4:Recycled Contentposted by Courtney Royal on
A lot of steel manufactures are providing a "LEED" letter that includes both recycled content values for Electric Arc Furnance (EAF) and Basic Oxygen Furnance (BOF) method of producing steel.
Outdoor Preferential Parking for Handicapped
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Maya Karkour on
Hello, I am working on a project, in which all the parking lots are located underground except 3 preferential parking lots for handicapped, located next to the main entrance (outdoor).
Use of this credit on a LEED-NC or -SCH project?
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by RETIRED on
Our team's interior designer is wondering if this credit can be utilized on a LEED-NC or -Schools project as an innovation credit.
biofuel acquired from utility provider to serve CHP on site
NC-2009 EAc2:On-Site Renewable Energyposted by Doreen Kruschina on
Hi, we are working on a project that will implement a CHP unit serving a residential and a commercial development of which the commercial one being will be certified. Both projects are run by the s
Solar PV Field
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Jason Cocek on
Does anyone know how a field covered with solar panels would factor into the stormwater calculation?
Currently scoring 85%
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Rebecca Hart on
Hi, I'd appreciate any tips or suggestions there may be from previous projects about how to score a few extra percentage points. We're currently on 85.5%, so close and yet it seems so far.
LEED consultant as CxA?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Valentin Grimaud on
Dear all, A simple question: we are the LEED consultant for a project, which is larger than 50000sqft. But we are directly contracted by the Owner.
Off site stormwater handling
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Alicia Freire on
Can we obtain this credit for a site that already has natural drainage systems surrounding it, i.e. outside the site boundary? The water that falls on the site is taken care of in a natural way.
green wall
NC-2009 WEc1:Water Efficient Landscapingposted by jorge calderon on
Hi, i like to know if green walls applies for this credit thank you in advance