Ventilation Rate for Occupied Warehouse
NC-2009 IEQp1:Minimum IAQ Performanceposted by Silvia Ruiz on
Hi, I am working on a project that consists of a two-story office building attached to a warehouse.
Modelling Existing Heating Plant serving new Extension
NC-2009 EAc1:Optimize Energy Performanceposted by Dónal O'Connor on
Hi all, I'm looking for some guidance on modelling a heating system for a new school extension that will be served from the existing boiler system. One of the options for a new school extension i
Playfields?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Omer Moltay on
(1) Would hardscape playfields such as basketball court count towards the pedestrian oriented hardscape? (2) What about turf surface soccer field?
New parking on an existing campus
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Helen Kessler on
Our project is a new classroom building on an existing campus.
central campus recycling area
Healthcare-v2009 MRp1:Storage and collection of recyclablesposted by Kathy Wislocky on
Can a central campus recycling area in an adjacent building contribute to the total recycling area for a project?
On-Site Renewable Energy and the Prerequisite 2
NC-2009 EAp2:Minimum Energy Performanceposted by Jalal Avades on
Is it OK to achieve the EA-P2 by including the onsite renewable energy generation OR we have to meet the prerequisite for the 10% better than ASHRAE and the two extra points BEFORE we take the cred
green roofs: can they count as regularly occupied space?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Carrie Laurendine on
project has a green roof that is accessible from a lounge. the lounge is a regularly occupied space. seems to me that people using the green roof area should be fair game (?).
Partially Irrigated Site
NC-2009 WEc1:Water Efficient Landscapingposted by William Weaver on
This question is somewhat related to Leah's question dated 1.23.2012, but a different circumstance.
Combined approach to WEc2
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Michael Wironen on
We have a project where, through efficient fixtures, we will reduce wastewater (WCs, lavatories, and showers) conveyance by approximately 45%.
Custom wood base - offsite millwork finishes included?
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Vince Briones on
Hi all, Just seeking confirmation as a situation pertaining to hardwood floor base.