CS-2009 EAp2:Minimum Energy Performanceposted by Markievicz E on
Hi Guys I have a pleasant dilemma. The project is new build offices in climate zone 5a.
Applies to equipment as well as building lighting?
Healthcare-v2009 MRc4.1:PBT source reduction - mercury in lampsposted by Chris Flint Chatto on
We have a question whether this credit applies to lighting integrated with medical equipment, or if the credit only applies to permanently attached building fixtures, like the low-VOC and other MR
Where can I find the VOC limits for sealants used as fillers?
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by yan lian on
Our review comments has one item, "Provide a revised plan that includes sustainability criteria for sealants used as fillers based on the requirements of BayArea Air Quality Management District Reg
Older existing building - no VLT available
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Mike Stopka on
Has anyone else experienced this? We are doing a Commercial Interiors project in a building that was constructed in the 1950s.
Dual toilet flush rate average
NC-2009 WEc3:Water Use Reductionposted by Mike D on
If we were to calculate the average flush rate of a dual flush toilet (with urinals present in the space) we use the example average flow rate equation provided by USGBC in their Appendix A water c
Option 1, Equipment Efficiency - Reuse of Existing Equipment
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Tony Ricketts on
Hi all, I have a tenant fit-out project served by water source HPs.
Residential Default Fixture Uses
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Tomas Kurka on
Hi, I am working on LEED certification of hotel project.
FSC Controlled?
NC-2009 MRc7:Certified Woodposted by Giselle Walsh on
I'm working with a manufacturer who has offered the wood in FSC Controlled or FSC Mixed. I can't find information on FSC Controlled on this page. Does that wood get full credit?
Ready made concrete elements
NC-2009 MRc4:Recycled Contentposted by Lise Dannesboe on
Hej! Do ready made concrete elements that are delivered on site count as assembly while in concrete that is cast on site the concrete and steel are two materials? Thanks!
Insulation
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Catalina Caballero on
Our project consist in a conversion from a warehouse to a university. but only part of the univeristy is being certified.