Interactive 90.1-2007 Compliance Form - ENVELOPE
NC-2009 EAp2:Minimum Energy Performanceposted by Sangmin An on
Hello, I am Sangmin of SGS Korea. I have a few question regarding Interactive 90.1-2007 Compliance Forms - building envelope compliance documentation (mandatory provisions checklist). 1.
Natural Ventilation Compliance - ASHRAE 62.1 2007 for LEED
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi! the only method to check compliance is this? - Based on Space Floor Area – Both Interior and Perimeter Spaces - Limitation on Distance of Interior Spaces from Perimeter Openings And...wh
Unfinished Engineered Hardwood
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Becky French on
Hello, It's stated in IEQc4.3 that unfinished/untreated solid hardwood automatically qualifies for this credit. Could the same be said for unfinished engineered hardwood?
Carpool spaces for motorcycles?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Erin Holdenried on
I have a project that includes a large number of motorcycle parking. Can motorcycle parking be excluded from this credit if pursuing Option 2?
Load Calcs for Don't Account for Natural Ventilation Operable
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Eric Shamp on
Our project is a major renovation to an existing college faculty office building with very low floor-to-floor heights. The lack of plenum space made air distribution ducts infeasible...
Energy Star shutdown
EBOM-2009 EAc1:Optimize Energy Performanceposted by Trista Brown on
Hi all Heads up that Energy Star's Portfolio Manager website will be completely unavailable from midnight June 26 through July 10!!
Multiple Zone or 100% OA (fancoil to outside air)
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi! I have a project where a fan coil is providing outside air (outside air treated) to other fancoils. How do I enter this fan coil (outside air) on the worksheet 62MZCalc? Must indicate in mul
Simulation on the 21 of september
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Xavier Bigot on
Hi! I was wondering why does LEED require to run a simulation on the 21st of september? It also requires to perform the simulation during a clear sky condition.
Pollutant Management Plan
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Michelle Xuereb on
As part of this credit, LEED Canada 2009 requires the owner to implement a management plan to minimize pollution and eutrophication of waterways from excess nutrient pollutants such as nitrogen and
Derated Insulation
NC-2009 EAp2:Minimum Energy Performanceposted by Todd Bundren on
I had a response from an energy model reviewer indicating my r-value calculations are not acceptable because we failed to derate the 3.5" R-11 batt insulation per Table A9.28B of ASHREA 90.1-2007.