Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Uploads for EAC1.3-1

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Nick Chiarelli  on 

I plan to submit the Carrier HAP load data for Load calculations and an April load data for Part Load Calculations, but I am not sure what to include for the Fan sizing and zone-by-zone load calcul

4
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Jul 9, 2013, 1:15 pm

Ks Species Factor

NC-2009 WEc1:Water Efficient Landscaping
posted by  Alicia Villanueva  on 

We need some help selecting the ks in our project. We are considering the following factors: Ks=0 for native species (no irrigation) Ks= Low. For adaptative species. Low watering. Ks= Average.

2
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Mon Jul 8, 2013, 10:06 pm

Crushed Concrete used

CS-2009 MRc3:Materials Reuse
posted by  Jeremy Theodore  on 

If existing site (or off-site) concrete is crushed and used for sub-grade base, is that re-used or recycled?

3
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Mon Jul 8, 2013, 8:49 pm

Task Lighting

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

I have two questions concerning Task Lighting: 1- for an office building, should I count task lighting as process load? 2- For Base-case Simulation, does the LPD limit set by ASHRAE 90.1 include

3
Mon Jul 8, 2013, 8:03 pm

High VOC coatings prior to closing a space

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Maya Karkour  on 

Hello, Does anyone know if we can use paints or coatings with VOC content well above the LEED requirements, as long as the envelope walls are not yet constructed (i.e., the surfaces are considered

4
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Mon Jul 8, 2013, 7:34 pm

E Cigarettes

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Robin Obaugh  on 

Has there been any commentary on whether how "e-cigarettes" align or do not align with the intent of this credit?

2
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Mon Jul 8, 2013, 4:33 pm

1/4 Mile Walking Distance - Crosswalks

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Mark Hirschi  on 

I am working on a project that is on a busy road. There are a couple of bus stops (two different routes) on the other side of this road from my project.

2
Mon Jul 8, 2013, 3:58 pm

recirculation

NC-2009 EAc1:Optimize Energy Performance
posted by  jaume balana  on 

Is it mandatory to have recirculation (for a system 4)?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4458 thumbs up
Mon Jul 8, 2013, 3:00 pm

Adhesive category for Foster 85-20

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  cathy keagle  on 

What is the appropriate category for Foster 85-20? Our contractor told us that it was Special Purpose Contact Adhesive. And how do we verify this?

3
Mon Jul 8, 2013, 1:10 pm

Defining the baseline

NC-2009 EAc5:Measurement and Verification
posted by  Gustav Alfaro  on 

Hi to all: Please help me to clarify how the baseline model is defined for the M&V plan, it is clear that for the "actual case" the proposed model created for the EAc1 must be calibrated based

5
Default Avatar
Mechanical Engineer
LEEDuser Basic Member
10 thumbs up
Fri Jul 5, 2013, 4:56 pm