LEED 2009 ID+C Study Guide Typo? IEQ C2

CI-2009 IEQc2:Increased Ventlilation
posted by  Elizabeth Ingram  on 

Hi! The above lists IEQ C2 as 5 points. Am I misunderstanding this? Is it another strange and wondrous EP or ID credit, or suite of credits?

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Thu Jul 4, 2013, 6:09 pm

Tenant spaces Completion

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Joel Cheely  on 

We are renovating urban buildings into apartments and speculative retail/commercial space. Some of the retail/commercial space will be constructed prior to application and some won't.

4
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Tue Jul 2, 2013, 10:16 pm

Can a credit in one rating system be considered ID in another?

NC-2009 IDc1:Innovation in Design
posted by  Stantec BG+LU FW  on 

Can a credit that occurs in one rating system be considered an ID credit in another rating system if there is no equivalent credit? The example: I am using LEED – NC.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Tue Jul 2, 2013, 8:37 pm

Submeter for process uses

CI-2009 EAc3:Measurement and Verification
posted by  Shoko Yasuda  on 

Hello, I am doing CI Retail project (LEED-CI 2009 EAc3 Case 1) and it includes dish washer and ice cube machine. I understand that we have to have sub meters for process loads.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4458 thumbs up
Tue Jul 2, 2013, 1:23 am

Compliance Path Questions

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Catherine Blakemore  on 

For each Group, do all products listed have to follow either Path 1 or Path 2? For eample Group 3 offers: Path 1.

2
Mon Jul 1, 2013, 9:02 pm

High bay Areas LPD

NC-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

We are working on a project with a bus repair bay areas for which we considered as "High Bay" areas for the energy model due to the fact that these areas are higher than 25 ft.

7
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Mon Jul 1, 2013, 3:17 pm

more than 1 system to simulate baseline building?

NC-2009 EAc1:Optimize Energy Performance
posted by  jaume balana  on 

Hello, Our project is a two floors and 1300 m2 building, opened to four orientations.

7
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4458 thumbs up
Mon Jul 1, 2013, 1:47 pm

Unmet Load Hours

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

HVAC plans show the room setpoint. This should be the OPERATIVE temperature.

2
Fri Jun 28, 2013, 5:35 pm

Raised Floor Wood Components

NC-2009 MRc7:Certified Wood
posted by  Sonia M. Miranda Palacios  on 

Hi all, I´m working in a project that will have raised floors with a wood beam (instead of metal) as support. The wood will not be "FSC" certified.

2
Principal
Jason Grant Consulting
LEEDuser Expert
115 thumbs up
Fri Jun 28, 2013, 3:21 pm

SSc4 - Number of building occupants - 24 hour facility

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Jessica Verhotz  on 

We are working on a hospital that is a 24-hour facility.

3
Fri Jun 28, 2013, 1:22 am