Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Restored materials

NC-2009 MRc5:Regional Materials
posted by  jaume balana  on 

Our project scope is an historical building restoration and retrofit. Several items such as windows, doors and floor tiles are removed, restored in a workshop near the site project and returned to

3
Thu Jun 13, 2013, 1:54 pm

Option 1, Case 1, Stream Channel Protection

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Adi Negara, LEED AP BD+C  on 

Hi all, We have a new construction project that is to build 30 ha factory, however the owner decided only to pursue LEED certification for the office building site, a small portion of the factory

5
Thu Jun 13, 2013, 12:27 pm

Capturing rainwater and discharge to the public sewer

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Panupant Phapant  on 

The FAQ of SSc6.2 (http://www.leeduser.com/credit/NC-2009/SSc6.2#sthash.3UFoAJvd.dpuf) suggests that capturing the rainwater into tanks and discharging it into the public sewers after the rainstorm

3
Default Avatar
SCG Cement - Building Materials
LEEDuser Basic Member
13 thumbs up
Wed Jun 12, 2013, 11:26 am

Latest Minimum Requirements for IEQc6.1

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Kathy Wislocky  on 

I see a few posts discussing the minimum requirements for both private offices and shared multi-occupant spaces, but some discussions are older and I'm wondering if LEED reviewer expectations or mi

2
Wed Jun 12, 2013, 12:08 am

Qualifying for MRc3

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Kelly Webb  on 

Our project (111,000+ sq ft, six story office building) will have an entire floor remodel, lobby entry remodel, and four restroom remodels all occurring during the performance period, albeit not si

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Tue Jun 11, 2013, 10:45 pm

EAc2 Submission Requirements

CI-2009 EAc2:Enhanced Commissioning
posted by  John Steingraeber  on 

I am very interested in pursuing LEED CI certification for a buildout of my firm's offices. This will be my/our first LEED project.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Tue Jun 11, 2013, 9:39 pm

Performance Period for MRc3 versus EAc1

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Karin Wohlert  on 

We are adding an addition to an existing facility. Ideally the performance period for energy would start after construction is complete.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Tue Jun 11, 2013, 9:25 pm

Surface finish on Concrete Yards slab pursuing SSc7.1

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Sean Hogan  on 

Hi, Smoother finish looks better than brushed finish on concrete, Are there any SRI issues to consider in deciding on the final texture, or is that all a function of the (initial) concrete colour

2
Sustainability Coordinator
Webcor Builders
LEEDuser Basic Member
40 thumbs up
Tue Jun 11, 2013, 3:13 pm

Question about sizing the silt trap

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Magda Aghababyan  on 

Hi, We are trying to pursue both storm water quality control and quantity control credits.

3
Tue Jun 11, 2013, 2:29 pm

How do you simplify the VOC budget method for one non compliant

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  cathy keagle  on 

I read the following. However, how do you do this in the template? Will it accept only putting in the amounts for the one product and the offset?

3
Tue Jun 11, 2013, 1:51 pm