Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Mineral-based finished flooring products

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Allen Cornett  on 

In an addenda issued on 4/14/10 the followimg is stated, “Mineral-based finish flooring products such as tile, masonry, terrazzo, and cut stone without integral organic-based coatings and sealants

2
Default Avatar
Architectural Designer
PGAV, Inc.
LEEDuser Basic Member
14 thumbs up
Mon Mar 4, 2013, 11:00 pm

Mock up Room Waste Management

NC-2009 MRc2:Construction Waste Management
posted by  John Covello  on 

Hi All, Our site is starting off with a mock up guest room villa as a test bed before we construct the balance of 90 odd guest villas.

3
Mon Mar 4, 2013, 9:26 pm

MPR for adjacent buildings

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

LEED project boundary lines that “slice” through party walls must not pass through any MEP service infrastructure.

7
Mon Mar 4, 2013, 4:43 pm

EAP2 Mandatory Requirement

NC-2009 EAc1:Optimize Energy Performance
posted by  OSCAR DE LA RED  on 

Can an almost construted building be certified under LEED C&S, if the envelope building is not able to comply with EAP2,EAc1 ASHRAE 90.1.2007 mandatory requirement (OPTION 2 and 3 are not av

6
Mon Mar 4, 2013, 4:08 pm

Creating own IDC Form?

CI-2009 MRc4:Recycled Content
posted by  Sean Falvey  on 

We are having lots of issues using the IDC Form that LEED provides, i.e., form not saving, formulas not working.

3
Principal
Sage Design & Consulting
LEEDuser Basic Member
55 thumbs up
Mon Mar 4, 2013, 3:22 pm

This is a serious question- How are you documenting furniture?

CI-2009 MRc5:Regional Materials
posted by  Valerie Molinski  on 

I am working on several CI projects right now, and I am having HUGE issues with documenting the furniture for this credit.

3
Fri Mar 1, 2013, 8:23 pm

ASHRAE 09.1-2007 Requirements for Baseline Wall Density

CS-2009 EAc1:Optimize Energy Performance
posted by  Wes Lawson  on 

Hi all, I am performing energy simulations for my baseline and proposed buildings for EAc1 (and EAp2). Can anyone help me out with the baseline wall density (lb/ft^3) that I should be using?

3
Default Avatar
Mechanical Engineer
Bala Consulting Engineers
LEEDuser Basic Member
4 thumbs up
Fri Mar 1, 2013, 7:56 pm

Part of HVAC considered as Process for clean rooms?

NC-2009 EAp2:Minimum Energy Performance
posted by  Valentin Grimaud  on 

Dear community, My project includes extraordinary energy consumption for HVAC resulting from maintaining clean room environments – specifically the amount of air changes and pressure requirements

3
Thermal Engineer
TERAO Green Building Engineering
LEEDuser Basic Member
28 thumbs up
Fri Mar 1, 2013, 7:18 pm

When do we start submitting information to achieve MRc2 credits

NC-2009 MRc2:Construction Waste Management
posted by  Dulian Terry-Swaby  on 

Hi, We are currently in phase #2 of demolition of a hotel that we plan to convert to a 4 star resort. My question is: When should we start submitting information to meet this credit?

3
Architectural Coordinator
Dart Realty (Cayman) Limited
LEEDuser Basic Member
0 thumbs up
Fri Mar 1, 2013, 1:50 pm

implementation costs (soft costs)

Pilot-Credits EQpc24:Acoustics
posted by  Emmanuel Pauwels  on 

We are considering this credit for a New Construction Project. Before making a decision we need to estimate the engineering cost involved for this credit.

4
Default Avatar
Corgan Associates
LEEDuser Basic Member
0 thumbs up
Thu Feb 28, 2013, 10:01 pm