when is the weatherproofing enclosed
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jaida Anderson-Lozano on
We are building a 13 story building that will have the envelope panels in place two years before all openings will be enclosed.
Training Program?
EBOM-2009 EAc2.2:Existing Building Commissioning—Implementationposted by Robert Andrews on
Any suggestions on a source for templates that can be used to document a staff training program? I am actually working with LEED EB v2.0, EAc3.1. Thanks!
Educational building program
NC-2009 IDc1:Innovation in Designposted by Diaa Madkour on
hi, Anyone has a reference or sample of the educational building program plan? and can anyone experienced through this credit advise about what is needed for its documentation?
Heat Pipe Simulation for EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Kai Andrade on
How do I simulate a heat pipe in the Baseline case? The proposed case has two split DX AHUs serving 22 & 15 zones respectively.
Meeting EAp2 in Zone 1 without A/C?
NC-2009 EAc1:Optimize Energy Performanceposted by Katrina Morgan on
We are starting design for a residential tower in Zone 1 (Hawaii) that will use natural ventilation and no mechanical air conditioning.
some doubts
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Albert Sagrera on
Hi, in our project we have a 60% of the site vegetated, planted with meadow, we have a small impervious surface near the building, and the building itself.
Apartment/Dorm
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Tommy Linstroth on
Reading the guidance and from past projects its always been pretty straightforward for showing compliance with an apartment or dorm when every room has an on/off switch.
counting "individual" spaces
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Erica Downs on
Would a private 2-person office count as one space or 2 when calculating the 50%?
Filtration during construction ( MERV 8)
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Sharon Morris on
I am currently working on a project that has a dual HVAC system. A Daikin mini split ductless system and a DOAS Desert Eir system with ducts & filtration.
Large Process Loads from Data Center in Office building
NC-2009 EAp2:Minimum Energy Performanceposted by Therese Malm on
We are working with a building where 60% of the annual energy use accounts for process energy due to a large data center.