when is the weatherproofing enclosed

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Jaida Anderson-Lozano  on 

We are building a 13 story building that will have the envelope panels in place two years before all openings will be enclosed.

4
Default Avatar
Architect, LEED Consultant
Polk Stanley Wilcox Architects
LEEDuser Basic Member
29 thumbs up
Thu Mar 7, 2013, 2:53 am

Training Program?

EBOM-2009 EAc2.2:Existing Building Commissioning—Implementation
posted by  Robert Andrews  on 

Any suggestions on a source for templates that can be used to document a staff training program? I am actually working with LEED EB v2.0, EAc3.1. Thanks!

6
Director of Energy Services
Environmental Building Strategies
LEEDuser Basic Member
38 thumbs up
Wed Mar 6, 2013, 10:24 pm

Educational building program

NC-2009 IDc1:Innovation in Design
posted by  Diaa Madkour  on 

hi, Anyone has a reference or sample of the educational building program plan? and can anyone experienced through this credit advise about what is needed for its documentation?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed Mar 6, 2013, 8:16 pm

Heat Pipe Simulation for EAc1

NC-2009 EAc1:Optimize Energy Performance
posted by  Kai Andrade  on 

How do I simulate a heat pipe in the Baseline case? The proposed case has two split DX AHUs serving 22 & 15 zones respectively.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4458 thumbs up
Wed Mar 6, 2013, 8:12 pm

Meeting EAp2 in Zone 1 without A/C?

NC-2009 EAc1:Optimize Energy Performance
posted by  Katrina Morgan  on 

We are starting design for a residential tower in Zone 1 (Hawaii) that will use natural ventilation and no mechanical air conditioning.

4
Default Avatar
Principal
Fermata Consulting, LLC
LEEDuser Basic Member
0 thumbs up
Wed Mar 6, 2013, 5:35 pm

some doubts

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Albert Sagrera  on 

Hi, in our project we have a 60% of the site vegetated, planted with meadow, we have a small impervious surface near the building, and the building itself.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Wed Mar 6, 2013, 5:23 pm

Apartment/Dorm

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Tommy Linstroth  on 

Reading the guidance and from past projects its always been pretty straightforward for showing compliance with an apartment or dorm when every room has an on/off switch.

2
Tue Mar 5, 2013, 11:14 pm

counting "individual" spaces

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Erica Downs  on 

Would a private 2-person office count as one space or 2 when calculating the 50%?

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Mar 5, 2013, 5:59 pm

Filtration during construction ( MERV 8)

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Sharon Morris  on 

I am currently working on a project that has a dual HVAC system. A Daikin mini split ductless system and a DOAS Desert Eir system with ducts & filtration.

3
Tue Mar 5, 2013, 4:59 pm

Large Process Loads from Data Center in Office building

NC-2009 EAp2:Minimum Energy Performance
posted by  Therese Malm  on 

We are working with a building where 60% of the annual energy use accounts for process energy due to a large data center.

4
Default Avatar
WSP Environmental
LEEDuser Basic Member
6 thumbs up
Tue Mar 5, 2013, 3:48 pm