Increasing Space Ventilation Efficiency by Increasing Vpz
NC-2009 IEQp1:Minimum IAQ Performanceposted by Ed Floyd on
Question seems to simple to me but I can not find a definate answer. Is it acceptable / Common to increase the primary air flow to a critical zone to increase the over system ventilation efficienc
Must Performance Period be complete before registering for pc67?
Pilot-Credits EApc67:Energy Jumpstartposted by Reid Middlebrooks on
Is pilot credit 67 only intended for projects that have already completed the EE improvements and can prove a 20% reduction?
Erosion Control
NC-2009 MRc2:Construction Waste Managementposted by Josh Mauldin on
The contractor on my project recently provided me with documentation that ~14 tons of concrete and brick that were removed from the site during demolition were used for erosion control.
ENERGY STAR sharing data in NC-2009
NC-2009 PIf1:Minimum Program Requirementsposted by Ryan L on
For our project we have selected Option 1: Energy and Water Data Release Form.
shopping mall
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Adam Targowski on
I'm working on a shopping mall project.
Ceramic tile coating applied off-site
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Marcio Alberto Casado Pereira on
Dear all, I'd just like to clarify: would ceramic be considered a mineral based floor and therefore be exempt from any tests?
GLASS CURTAINWALL
NC-2009 EAp2:Minimum Energy Performanceposted by LEED Pro Consultant on
Hello! I would like to know from those who have worked with curtain walls, which U value do you take from ASHRAE for the baseline of the project.
Would this be suitable use for this credit for a CS project?
CS-2009 MRc3:Materials Reuseposted by Megan Bove on
We have 665 open ended 8 inch diameter steel pipe piles that were originally made for oil drilling but were discarded because they did not meet oil drilling tolerances.
Bus Bay Areas
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
Should Bus Maintenance Bays be included in this credit? People work in this areas more than 8 hours a day but how would you show compliance?
Waterbody
ND-v2009 SLLp3:Wetland and water body conservationposted by Dina Ammar on
Is a marina considered as a water body? If not, will a new development still need to abide by the 100 feet buffer zone distance?