Building flush-out of entrance vestibule
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Julie Pollack on
During the performance period for LEED EBOM, the building owner is remodeling the main entrance vestibule to the project building.
Urban Core, Urban, SubUrban, Rural Definitions
NC-2009 PIf2:Project Summary Detailsposted by Rebecca Grant on
Can anyone point me in the right direction to find definitions on Urban Core, Urban, SubUrban and Rural for Project Information Form 2?
Building Foot Print
NC-2009 PIf2:Project Summary Detailsposted by renee jimenez on
Im working on a Baseball Stadium and am tring to determine what I should use for my Building foot print square footage.
Anti-Rust Paint or Rust Preventative Coating
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Adriana Hansen on
Hello, We are having doubts to classify an anti-rust product, because we don´t know if it should be considered Paint or Coating (mainly because the VOC limits are very different) and with which Ru
100% solids paint
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Michael E. Edmonds-Bauer on
A paint manufacturer just told us that a paint 100% solids has alway 0 VOC. I would like to know if someone has any experience about this.
Flat & Non-Flat Paint
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Abdulrahman Sherazy on
Is there another simple definition or way to know whether the paint is flat or non-flat?
Signed and dated PDF
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Soo young No on
We have just received preliminary comments. For credit IEQ p2, it said "Please provide a signed and dated PDF copy of the IEQp2 prerequisite form." We already uploaded owner signed IEQP2-RS1. Do we
LEED CI Project in Argentina, mainly KITCHEN NON "ES"
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Sonia M. Miranda Palacios on
I´m working in a project in Argentina which is up for LEED CI. The project is mainly a new commercial kitchen and dining area for 250 persons.
Proposed Building Boiler Plant / Baseline Building System
NC-2009 EAc1:Optimize Energy Performanceposted by Blas Beristain on
Hello, In the proposed building simulation, some of the spaces are not yet defined and therefore are being simulated as office spaces with System 3 - PSZ-AC.
SSc4.3 & SSc4.4: Rounding to the 5% requirement
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Vinsu Shah on
Our project was recently denied both of these credits on not meeting the 5% requirement.