Forum quick links
IEQ Pr1 - work code in France in place of ASHRAE
NC-2009 IEQp1:Minimum IAQ Performanceposted by Nicolas MOLLE on
Can you confirm me that it is possible, in France, to use the work code to determine the air rate in place of the ASHRAE 62.1-2007 in the places where this local code is more stringent ?
Increasing Space Ventilation Efficiency by Increasing Vpz
NC-2009 IEQp1:Minimum IAQ Performanceposted by Ed Floyd on
Question seems to simple to me but I can not find a definate answer. Is it acceptable / Common to increase the primary air flow to a critical zone to increase the over system ventilation efficienc
Must Performance Period be complete before registering for pc67?
Pilot-Credits EApc67:Energy Jumpstartposted by Reid Middlebrooks on
Is pilot credit 67 only intended for projects that have already completed the EE improvements and can prove a 20% reduction?
Erosion Control
NC-2009 MRc2:Construction Waste Managementposted by Josh Mauldin on
The contractor on my project recently provided me with documentation that ~14 tons of concrete and brick that were removed from the site during demolition were used for erosion control.
ENERGY STAR sharing data in NC-2009
NC-2009 PIf1:Minimum Program Requirementsposted by Ryan L on
For our project we have selected Option 1: Energy and Water Data Release Form.
shopping mall
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Adam Targowski on
I'm working on a shopping mall project.
Ceramic tile coating applied off-site
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Marcio Alberto Casado Pereira on
Dear all, I'd just like to clarify: would ceramic be considered a mineral based floor and therefore be exempt from any tests?
GLASS CURTAINWALL
NC-2009 EAp2:Minimum Energy Performanceposted by LEED Pro Consultant on
Hello! I would like to know from those who have worked with curtain walls, which U value do you take from ASHRAE for the baseline of the project.
Would this be suitable use for this credit for a CS project?
CS-2009 MRc3:Materials Reuseposted by Megan Bove on
We have 665 open ended 8 inch diameter steel pipe piles that were originally made for oil drilling but were discarded because they did not meet oil drilling tolerances.
Bus Bay Areas
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
Should Bus Maintenance Bays be included in this credit? People work in this areas more than 8 hours a day but how would you show compliance?