Forum quick links
Commissioning Walk-in Freezers / Coolers
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Richard Woodward on
We have a mixed use new office / commercial kitchen project with owner occupiers.
Calculating Vot in Credit Template
CI-2009 IEQp1:Minimum IAQ Performanceposted by Rick Servoss on
The Template calculates Vot by dividing Voz by Ev. ASHRAE 62.1 2007 arrives at Vot by dividing Vou by Ev, not Voz.
M&V Plan - Specific Acceptable Range(s) of Error
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Marina Andrade on
Hello, I just got the review comment requesting the “specific acceptable range(s) of error”, follow the comment bellow. “TECHNICAL ADVICE: Please revise the Measurement and Verification Plan, as
Audits Around the World
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Jenny Carney on
All, I'm trying to compile a list of energy audit providers outside of the US.
Air cooled chillers and other air cooled equipment.
NC-2009 EAp2:Minimum Energy Performanceposted by Rudolph Carneiro on
Question: If I have an air cooled chiller selected at non-ARI conditions that has a full load efficiency of 3.0 COP, does it comply with the minimum efficiency requirement of 2.8 COP from ASHRAE -
Innovation points no longer recognized?
NC-2009 IDc1:Innovation in Designposted by Kris Phillips on
I have conflicting information on a few Innovation points that have been achieved on certain projects, but are apparently being denied on current projects being deemed "too easy" by the GBCI review
Cooling and heating specification
NC-2009 EAc1:Optimize Energy Performanceposted by Jatuwat Varodompun on
If my project does not have any heating system at all (but it will have cooling system), Are the baseline and proposed models required to have defualt heating system as specified in appendix G?
Evaporative Coolers and ASHRAE Mandatory Requirements 6.4.3.4
NC-2009 EAc1:Optimize Energy Performanceposted by Jorge Torres-Coto on
If I have a space (manufacturing warehouse) that is served by Evaporative Coolers only. Do the Mandatory Requirements of ASHRAE 90.1 section 6.4.3.4.2 & 6.4.3.4.3 apply?
Submetering - Process Water
CI-2009 EAc3:Measurement and Verificationposted by Michelle Rosenberger on
I can see in the threads some discussion about submeters and what really constitutes complying with Case 1 but I'm still confused.
Title 24 vs. ASHRAE as baseline
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Michelle Rosenberger on
I'm not sure where to post this EApr2 form but Lighting Power Density question. I see there has been some discussion about the issue of Title 24 vs.