Make Up OA unit and energy modelling
NC-2009 EAc1:Optimize Energy Performanceposted by Jatuwat Varodompun on
my project is a hotel with the fan coils and Outdoor Air Units supplying the OA to each room.
Prime farmland vs farmland of statewide importance
NC-2009 SSc1:Site Selectionposted by Lisa Sawin on
We have a site that is a previously developed urban site. According to the web soil survey from the USDA it is adjacent to Prime farmland and on Farmland of statewide importance.
office vs. hotel
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by John Carino on
We are building a hotel and it seems many of the credits are focused on office buildings.
Conditioned floor
NC-2009 EAp2:Minimum Energy Performanceposted by Rodrigo Dias on
Hello I'm working on a project that has conditioned areas on 6 floors, but in two of those floors has only 5% of all conditioned area , can I consider these floors conditioned as the another floo
Parking garage
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
I have modeled parking garage in the simulation by taking 0.75 cfm/sf (exhaust)from ASHRAE 62.1-2007 which leads to energy consumpation of 43,450kWh.
Core and Shell project including restaurant
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Anna Korinkova on
Our project is a C&S building with a restaurant on the ground floor. A tenant has been already appointed but he wants to have his restaurant meant for smokers.
EAp2
NC-2009 EAp2:Minimum Energy Performanceposted by George Bender on
The project is a railcar vehicle maintenance facility (VMF) a couple acres large. This project falls under new construction and includes a new rail track to be brought into the VMF.
Grass only, no irrigation
NC-2009 WEc1:Water Efficient Landscapingposted by Marcio Alberto Casado Pereira on
Hello Our client is using only grass in the landscaping and this is not going to be irrigated. Are we elegible for credit WEc1?
Systems Manual
CI-2009 EAc2:Enhanced Commissioningposted by Frank Weiss on
I was envisioning the Systems Manual to be an O&M manual with drawings, equipment manuals etc. Upon GBCI review we received the comments shown below.
Baseline for plumbing upgrades
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Jessica Hawley on
Please help me figure this out... We're working with a building built in the 80's, all original plumbing and fixtures.