Forum quick links
farmland and disturbance limits
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Adam Targowski on
1. Does farmland fall under case 1 or 2? 2. Case 1 requires to limit site disturbance. Does it mean that materials storage and all construction facilities have to be within these limits?
Combining Option A and B
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by William Thompson on
Can Options A and B be combined? Someof the floors are occupied and have met Option B testing requirements.
To include or not to include windows
CI-2009 MRc7:Certified Woodposted by Christina Welzel on
Hello LEEDuser team, do I need to include windows with wooden frames into the calculation? The windows have been fitted during construction stage and were not part of the tenant fit-out.
farmland
CS-2009 SSc1:Site Selectionposted by Adam Targowski on
In the past most of the site (around 48,000m2) was used as a farmland and a summer plot containing of little houses with little gardens (where people could grow vegetables or flowers).
Frequency of survey...
CI-2009 IEQc7.2:Thermal Comfort—Verificationposted by Heather Walters on
We just received a question from our certification team asking us to clarify the frequency of the comfort survey?
Warehouse and FTE
NC-2009 PIf3:Occupant and Usage Dataposted by Jean-Baptiste Noel on
I am currently working on a building project that is a warehouse (distribution center).
Tenant commitment for Residential Building in NC Certification
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Melissa Merryweather on
I am looking at a mixed-use high-rise project with a residential portion.
Invoice for Wood in Assembly (Display Boards)
NC-2009 MRc7:Certified Woodposted by Carly Ruggieri on
I've had some major difficulty with documentation for Certified Wood due to small amounts of wood in assemblies, specifically the backing on markerboards/tackboards.
Multiple Buildings - Energy Modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Marina Andrade on
Hello, I'm working in a project that consists in a multiple building certification.
Worsktation requirements
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by severine secret on
If I have a workstation made of Greenguard certified panels, Greenguard plastic laminate but particle board top that has no certification ( even though NAUF), can I still get the credit?