Forum quick links
Pilot Credit 42: Integrated Process
NC-2009 IDc1:Innovation in Designposted by AshLee Eustace on
My project had been planning on registering for Pilot Credit 42: Integrated Process, but it appears that this is pilot credit is no longer an option.
Wall covering adhesive
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Bruce Maine on
Apologies if I've missed a post but is the VOC threshold for wall covering adhesives 50 g/L or 70 g/L? Or something else? Thanks.
Ceiling Clouds
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Eri Spaulding on
We have a music room with some hanging ceiling clouds that contain acoustical ceiling tiles with a high NRC (.90). Can we count the cloud areas twice?
Fuel efficient car vs single occupancy and 2-person carpool
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Andrea Marzullo on
One commuter drove a Civic hybrid each day to work (10 trips under fuel-efficient car).
Occupied/Partially Occupied definition inquiry
NC-2009 PIf3:Occupant and Usage Dataposted by Alfred Rosales on
In the guidebook, the definition of Regularly occupied spaces are areas where workers are seated or standing as they work inside a building. I would like to inquire the following: 1.
Pre Development & Post Development runoff rate & quantity zero
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Heather Holdridge on
We are working on a Core & Shell project on Cayman Islands and would like to pursue SS Credit 6.1 & 6.2.
IEQp1
NC-2009 IEQp1:Minimum IAQ Performanceposted by susan eguia on
Hi, We've got the review comments from USGBC that says: "Please provide a separate ventilation rate procedure calculation for each multiple-zone recirculating system serving the LEED-NC project.
2% leakage rate
EBOM-2009 EAc5:Enhanced Refrigerant Managementposted by Tristan Roberts on
Since there has been some discussion on this topic on this forum before, I wanted to make sure everyone is aware of the 11/1/11 LEED addendum stating that "If new equipment is being installed, use
Cube Partition height 46"
EBOM-2009 IEQc2.4:Daylight and Viewsposted by John Frey on
My project has large floor to ceiling windows but the cube height is 46". Someone with an eye level of 42" can see sky, clouds, trees and hilltops above the 46" high cube walls.
Efficiency for hose irrgation?
NC-2009 WEc1:Water Efficient Landscapingposted by Marcio Alberto Casado Pereira on
Doe anyone knows which efficiency to consider for landscape to be irrigated manually by a hose? Thanks