Forum quick links
ASHRAE Standard 62.1 - 2010
NC-2009 IEQp1:Minimum IAQ Performanceposted by Maya Karkour on
Hello, Does anyone know if the ventilation system/strategy of a LEED 2009 project can be designed according to ASHRAE 62.1-2010 instead of 62.1-2007? I haven't looked at the 2010, but I heard the
Lavatory Faucets - gpm
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Michelle Teague on
We are having a little trouble with the flow fixture table calculations. We specified Sloan automatic sensing faucets.
System serving new and exisitng spaces
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michelle Ruda on
In the reference book, under IEQc1 point 4.
90.1-2007 PTHP minimum efficiency requirements
NC-2009 EAc1:Optimize Energy Performanceposted by TOMAS URIBE on
Hello guys. I am modelling a hotel for LEED purpose.
Special Circumstance
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Omer Moltay on
Although there are spaces in our project that require the installation of flowmeters for this credit, our mechanical engineer is arguing that these are unnecessary for the following reasons: - Spa
Motorcycles and parking spaces
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Valentin Grimaud on
Hello, I have several questions that cover this credit and the previous one: - Is it possible to have at the same time a discount rate for carpool and for fuel efficient vehicles?
Licensed Professional Exemption
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Elliot Powers, LEED AP BD+C on
The LEED-Online submittal form states that a LPE is available to Registered Civil Engineers in lieu of providing an ESC plan and construction drawings.
Residential unit spaces are regularly occupied?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Jean Marais on
NC project with some residential units included... 1) Which residential unit spaces are regularly occupied? - lounge - bedroom - children's bedroom - open plan kitchen Your views are appreciated.
Non-default values for Lr and Mr
CS-2009 EAc4:Enhanced Refrigerant Managementposted by Magnus Stagnäs on
According to the reference guide I can use non-default values for Lr and Mr if providing supporting evidence material.
Option 2
NC-2009 WEc1:Water Efficient Landscapingposted by Divjot Singh on
Option 2 states: "Meet the requirements for Option 1. AND Path1 OR Path2" Now I have a doubt.