Forum quick links
FSC Mixed split between MRc7 and MRc4
CI-2009 MRc7:Certified Woodposted by Lloyd Johnson on
We are using products sold as FSC Mixed for our cabinetry in our LEED-CI project.
Reused Windows from the Project Building
CS-2009 MRc3:Materials Reuseposted by Christian Brücher on
Hello, following situation: We have a CS project, where we will have a new construction part and a building renovation.
Separating High Energy Consumer as a "Process Load"
NC-2009 EAp2:Minimum Energy Performanceposted by Todd LaFreniere on
I have a project that is just starting and we have a somewhat unique situation.
School Daylighting - more than one type of VLT
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Nanechka Pagan on
I am currently using the prescriptive method supporting LEED calculator. Each classrooms have two types of VLT.
zip car system
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Gita Nandan on
my client is hosting a zip car car share program into the parking lot of the building. will this count towards meeting the needs to facilitate shared vehicle usage?
E-Waste Line Item Division?
EBOM-2009 MRc8:Solid Waste Management—Durable Goodsposted by Alexis Thompson on
Does LEED require that you break out the e-waste into line items and weigh each line item separately (ie "Computer Monitors... 30 lbs", "Copiers...100lbs")?
Restaurant Lighting as a Lease Requirement
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Iris Amdur on
The only shared multi-occupant space in my project is the Restaurant Dining area. This space will be a tenant fit-out, and until then, temporary lighting fixtures will be installed.
Hazardous materials
NC-2009 MRc2:Construction Waste Managementposted by Tanja Arnesson on
Hi, I have a question regarding hazardous materials, at one project the review team calculated the combustible materials for energy recovery as hazardous materials and tehrefore I wonder if this i
Sylvania Ecologic Lights
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Patrick Culhane on
Our project team considering purchasing ECOLOGIC lamps from Sylvania to fulfill this credit, however we aren’t certain if these are accepted under LEED.
CO2 sensor in kitchen & others
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Guillermo T. Adamo on
Hi, we are working in a Gas station with three different type of spaces. 1) Individual offices with one or two employees, naturally ventilated.