Forum quick links
Components to be included in the calculations for MRc5
CI-2009 MRc5:Regional Materialsposted by Diana Nezamutinova on
Should lighting be included in the calculations? It is neither a Division 12 component, nor a construction material.
Green Cleaning Policies
EBOM-2009 IEQp3:Green Cleaning Policyposted by Wendy Lao on
Are there any examples of GC policies that could be shared?
Silicone sealant for glass block installation
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Adi Negara, LEED AP BD+C on
Dear all, Does the silicone sealant used for the glass block installation need to comply with the maximum VOC requirements of this credit?
SSc3.3 Alternative Transportation - Parkign Availability
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Ashley Quinn on
We are working on a project for LEED-CI.
Define Movable Furnishings of IAQ Testing
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Holly Himes on
The Reference Guide states movable furnishing such as workstations and partitions must be in place during IAQ testing.
Authentication of water fixture installation date
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by David Mortensen on
Had anyone successfully used as-built drawings to verify the installation date of water fixtures?
Exotic plants
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Matthew Perna on
Has anyone had success contending that exotic plants in the project area should be counted for credit (or partial credit) because they are providing functional benefits related to habitat protectio
Reporting offset purchases on form EAc4
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Michael Miller on
The reference guide is explicit that if you are purchasing off-site renewable energy for fuels combusted on site (Scope 1 emissions), it needs to be done via carbon offsets ("Green-e Climate or equ
Controls for open-floor plan
CI-2009 IEQc6.1:Controllability of Systems—Lightingposted by Diana Nezamutinova on
Our project is following CI-2009 guidelines. What lighting controls would be sufficient for offices with open floor plans?
Flooring Underlayments
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Michele Helou on
Does anyone know if sound control underlayments (homosote or cork) need to also be FloorScore rated for this credit?