Pilot-Credits PC11:Chemical Avoidance in Building Materialsposted by Julie Hendricks on
I'm thinking of submitting for this pilot credit with one of my products being a type 6,6 Interface carpet tile (Tectonics).
timeline for investigation and analysis
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Pablo Fortunato Suarez on
My clients have prepared six-sigma projects for improvement that have a timeline of 5 years (since 2006).
Sealant for Joints
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Maya Karkour on
Hi, I am was wondering if the sealants for concrete joints (slab on grade) at a basement level, must comply with the requirements.
MR c3.2 Materials Reuse - Furniture & furniture
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Pamela Branch on
My client is a small non-profit, and on a shoe string budget. They are using used or donated furniture for 100% of their Furniture/Furnishings.
IEQp1 compliance for high-rise with 1 outdoor air intake
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Dawn Brenner on
The 1987 high-rise building in California I am attempting LEED certification for has an EnergyStar label and, thus, was signed off by a PE as meeting ASHRAE 62.1/2007.
SSc2 Option2
CI-2009 SSc2:Development Density and Community Connectivityposted by Holly Himes on
Does the entire residential area within the 1/2 mile radius need to be 10 units per acre or more or just a selection of higher density housing choices within the 1/2 mile radius?
Documenting the credit...
CI-2009 SSc2:Development Density and Community Connectivityposted by Jennifer Berthelot-Jelovic on
I am currently submitting for a LEED CI v3.0 project and need to document the Development Density. I have no issues with Community Connectivity.
Vacancy - EQp1 Calculations
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Alice Cook on
We have a floor that is vacant in our project building.
Measure AHUs or measure air flow in each room?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Michelle Perez on
Hello, We are currently working on a LEED EBOM project at our University campus.
Wood Palettes
NC-2009 MRc2:Construction Waste Managementposted by Samantha De Leuw on
On my project, the subcontractors are responsible for reusing wood palettes and, if applicable, selling them back to the manufacturer. Is there a way to record this?