Forum quick links
FloorScore certification
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Juliana Malho on
Are Limestone and Marmoglass considered as hard flooring system, and thus, has to be FloorScore certified fo IEAc4.3?
Alternative Compliance Path Documentation
CS-2009 WEp1:Water Use Reductionposted by R Jones on
I wish to pursue an Alternative Compliance Path for taking account of collected rainwater being used for the toilet and urinal flushing under credit WCp1 and WE3.
Central Plant Re-Location
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Reynaldo Castro on
Hello we are a LEED-EB O&M V3 Certified Project and are planning a major remodel of our existing building. Including Re-Location of entire existing central plant.
Exemplary Perfromance
CI-2009 SSc2:Development Density and Community Connectivityposted by Méabh Browne on
Hi, Is it possible to get an ID Exemplary Performance for this credit? I thought it wasn't but the form seems to indicate that it possible. If it is, then what are the requirements? Thanks
Exemplary Performance
Schools-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Thorn Grafton on
According to page 46 the LEED reference guide, it states the following: (FOR SCHOOLS - If a school bus system is being counted as 1 of the required bus lines to meet the requirements of Option 2, e
Option 3 - Measurement
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Robin Bass on
My team opted to use the measurement approach to document this credit for a recent 48,000 sq ft interior project.
Code defines Maximum Open Space
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Daniel Hartsig on
Hello Everyone- I'm currently working on a project where the local code defines no minimum amount of open space. Instead, they define a maximum amount of open space (at 19% of site area).
Mandatory provision in LEED CS
CS-2009 EAp2:Minimum Energy Performanceposted by Roger Moquin on
We actually construct a high rise office building with commercial area at the first level.
What about SIPs?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Nelina Loiselle on
Would structural insulated panels made from PS foam cores sandwiched between OSB (Oriented Strand Board) panel faces qualify?
What about for an initial interior fit-out?
Pilot-Credits PC20:Recycled Contentposted by Habitech Distretto Tecnologico Trentino on
Hello all. I am working on a LEED-CI project. The situation is an initial interior fit-out (build-out of areas where there are no existing interior walls, finishes, etc.) and the tenant's scope of