Good or no?
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Elizabeth Crenshaw Hammitt on
The way I am interpreting this credit, it would seem that is the project was built post 1994, while a baseline can be calculated, there is no chance of not meeting the PR as long as a satisfactory
Cx for Domestic HW to Point of Connection - Sink only
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Harvard University Green Building Services on
We have a project where a sink was added as part of the scope and tied into existing cold and HW supply lines, with no alteration to any other part of the domestic HW system.
Equipments to be commissioned
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Alvaro Valdivia on
Hi: I have a boubt about the water heating equipment to be commissioned.
Information: Regional Priority Credit on International Projects?
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Raymond Loo on
My understanding is that an extra Regional Priority Credit can be earned on international projects here. Does anyone have any details to the actions required to get this RPC point?
Exempt compounds
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Paola Figueiredo, Newton Figueiredo on
The LEED´s definition of VOC should not be exclude the exempt compounds from the VOC content. However, according to the SCAQMD rules 1113 and 1168, the exempt compounds must be calculated.
Interior concrete stain
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Chris Sanders on
Does interior concrete floor stain fall into the Floor Coatings category, with 100 g/L VOC?
0% Open Space Requirements
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Nándor Kovács on
I'm working on a project located in high density urban area which means 100% of the site can be built in the ground floor. How do i have to calculate 25% in this case?
Steel structure enamel
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by javier bolanos zeledon on
Hi, this is a retrofit of an existing building where all the exterior structural walls are being replaced and also the interior walls.
SSc4 EBOM v2.2
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Sheryl Swartzle on
Our project is 750,000 sf office with 1277 occupants. Project is located in Miami and has it's own parking garage.
Calculating material costs in MRc4 and MRc5
NC-2009 MRc4:Recycled Contentposted by Alexander Aaltonen on
I have similar concerns as Maria described earlier, and I would really appreciate some advice on how to calculate material costs in a case where a sub-contractor is performing concrete works on-sit