Late Enhanced Comissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Carolina Vergnano  on 

Does exist any time limit between the construction conclusion and the start of enhanced comissioning? i.e.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Tue Apr 26, 2011, 12:42 pm

All parking underground but one..

CS-2009 SSc7.1:Heat Island Effect—Nonroof
posted by  Mathilda Jonsson  on 

Hi! My project has all parking spaces underground exept for one handicap parking that's situated at the court yard. We really want to go for exemplary performance point and put all under cover.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Apr 26, 2011, 5:57 am

"90% Minimum of building occupants"

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Sandra Heiser  on 

The requirement reads " Provide individual lighting controls for 90% (minimum) of the building occupants..." Is this based on the FTE? Or does it mean 90% of the individual workspaces?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 25, 2011, 3:40 pm

WE Prerequisite qualification for a minimal CS project

CS-2009 WEp1:Water Use Reduction
posted by  Tak Louie  on 

Our client is building a Retail center for a large grocer with small satellite retail spaces. The balance of the building is simply a parking garage with an enclosed and tempered elevator lobby.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 25, 2011, 1:30 pm

Option 3, approach 2: Random selection

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  gwenedd murray  on 

This building is over 300,000 sf and located close to public transportation. Half of the tenants are government agencies.

3
Mon Apr 25, 2011, 1:20 pm

Natural Ventilation - Single Space

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Omer Moltay  on 

Almost all the spaces in our building is mechanically ventilated, except the entrance lobby which receives outside air through revolving doors. The revolving door opening area and the 8 m.

3
Sun Apr 24, 2011, 12:58 am

Irrigation - Baseline case

NC-2009 WEc1:Water Efficient Landscaping
posted by  Maya Karkour  on 

Hello, The guidance is not really clear on what to put in the baseline case. It only says that we need to specify typical landscaping practices.

4
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Sat Apr 23, 2011, 10:01 pm

Historic Renovation Sill Heights

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  John Chyz  on 

Our project is a major renovation of a 2-story historic building. The existing window openings can not be changed without significantly altering part of the preservation.

2
Sat Apr 23, 2011, 2:13 pm

Negative pressure differential test

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Shoko Yasuda  on 

We have disignated smoking rooms in the building. Now we are planning to carry out negative pressure defferetial test for thes rooms. There are 2 questions. 1.

3
Default Avatar
Lend Lease Japan
LEEDuser Basic Member
12 thumbs up
Fri Apr 22, 2011, 11:40 pm

Calculation Spreadsheet

EBOM-2009 IEQc2.4:Daylight and Views
posted by  Melissa Merryweather  on 

I can't use the Supplemental Spreadsheet. I believe it might be because its not designed to be very compliant with Mac software, though this is a guess.

9
Fri Apr 22, 2011, 11:35 pm