Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Project boundary within an existing building

CI-2009 SSc2:Development Density and Community Connectivity
posted by  R Jones  on 

Hi - when doing the calculations for option 1 - should i include the sf of the project (ie tenant space) or the whole building - then divide it by the area.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Thu Mar 17, 2011, 6:04 pm

Wood as thermal barrier

NC-2009 EAc1:Optimize Energy Performance
posted by  javier bolanos zeledon  on 

Is it valid to use 1" wood as thermal barrier for the construction of roof insulation.

5
Wed Mar 16, 2011, 7:24 pm

Major renovation

NC-2009 EAc1:Optimize Energy Performance
posted by  javier bolanos zeledon  on 

This is a major renovation of an old office building. The new building will use structural walls and metal roof of previos building.

3
Wed Mar 16, 2011, 7:13 pm

IT ROOM LOADS

NC-2009 EAc1:Optimize Energy Performance
posted by  javier bolanos zeledon  on 

In an IT room there are envelope loads and equipment loads due to HVAC needed to cool the space. Also the electric load due to the IT equipment running.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Mar 16, 2011, 6:35 pm

Reference evapotranspiration rate ET0

NC-2009 WEc1:Water Efficient Landscaping
posted by  Werner Sobek  on 

We have a project located in Istanbul, Turkey.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 16, 2011, 4:48 pm

Guidelines on Construction waste Handling

NC-2009 MRc2:Construction Waste Management
posted by  Amgad Khattab  on 

Hi, I’m currently working on a LEED project in Egypt. Waste handling is a new subject for us and I need some guidelines on the following: 1.

2
Wed Mar 16, 2011, 4:30 pm

Combining Tenant Lease Agreement with the Tenant Guideline

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Maya Karkour  on 

Dear all, My project is a retail mall, and we are going for this LEED SS Credit 9. I was wondering if I can combine both of the following in 1 document: 1) Tenant Guidelines (for the sake of this

2
Senior Sustainability Manager
YR&G
LEEDuser Basic Member
62 thumbs up
Wed Mar 16, 2011, 10:16 am

Building Reuse

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Brian Blodnikar  on 

We are constructing a new building next to the existing building, the two buildings will not be attached.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Mar 14, 2011, 1:57 pm

Energy Star - Statement Energy Performance

EBOM-2009 WEc1:Water Performance Measurement
posted by  Simon Sue  on 

Please help: I generate Energy Star Statement of energy performance (SEP) and realize that the whole statement does not have any water usage summary.

2
Sun Mar 13, 2011, 2:37 am

Weather data

NC-2009 EAc1:Optimize Energy Performance
posted by  javier bolanos zeledon  on 

I'm modeling a project oustide the US with Carrier HAP.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Mar 12, 2011, 11:09 pm