Forum quick links
Deriving Minimum Efficiency Requirements for Baseline Chillers
NC-2009 EAc1:Optimize Energy Performanceposted by heinrich post on
We are wondering how to interpret the Minimum Efficiency Tables of Chapter 6.8 in ASHRAE 90.1-2007 to model HVAC efficiencies of baseline equipment. Our baseline building has a floor area > 150.
Accepting other testing methods
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Petra Hajná on
Building materials are required to comply with SCQAMD rules which state VOC limits for various types of materials.
Recommissioning vs Commissioning experience for CxA
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Dustin Campbell on
We would like to get a comment from someone that has had experience with this: When selecting a CxA, would someone that has eperience on 2 or more projects as the "Recommissiong Authority" be suff
double counting 7.1 and 7.2?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Christopher Sawyer on
My project is a bus maintaince depot in New York City with a zero lot line. The top floor (under the "roof" is all bus parking for vehicle maintenance and storage).
A person who is responsible for the thermal comfort?
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Mathilda Jonsson on
In the project I'm working at there are seperate office spaces.
Custom Built Salvaged Wood Furniture
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Max Calabro on
I'm working on a restaurant, and we're having our dining tables custom built from salvaged wood.
Louver Vents
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Biagio Arevalo on
Does anyone know if for the prescriptive path the light that passes through lovers count?
LT, VLT & Tvis
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Biagio Arevalo on
I´m planning to approach this credit through the prescriptive path but I´ve been having some difficulties finding the Tvis for the glass.
Occupant "Eco-involvement"
CS-2009 IDc1:Innovation in Designposted by Julien Daclin on
On a french project, the future occupants will be involved in the best practice functionning of the building. When external conditions are satisfying (temperature and wind) LCD screens placed in th
Limiting access once the building is enclosed
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Vanessa Seibert on
Our experience on projects is that limiting the access to one door with a long, regularly cleaned carpet, is expected by the LEED reviewer.