Forum quick links
Exhausted heat
NC-2009 EAc1:Optimize Energy Performanceposted by Kath Williams on
Can a LEED project use exhausted/waste heat (and claim credit of some kind) from an adjacent building that is not being included in LEED project boundary?
Systems Furniture Panel Fabric
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Lori Selcer on
We have specified panel sysems for our project which are Greenguard certified. However we are using COM fabric for the panels, that is, we are using fabric from another manufacturer.
Savings calculations
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Sundararaj Subburaman on
Our client is occupying the 8th floor of a G+8 building. The central plant is a combination of Air cooled and water cooled chillers.
Completing the LEED Template for WEp1
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by R Jones on
We are needing to go down the route of Case 4 where there are facilties in landlors and tenant areas but we can only pursue the WEp1 which is fine.
Hazardous Waste
NC-2009 MRc2:Construction Waste Managementposted by Veronika Sundberg on
Hi, I’m currently working on a LEED project in Sweden. In overall we are very good at waste handling, but I think that we include different fractions in hazardous waste.
ASHRAE 90.1-2007 Lighting Compliance Documentation
CI-2009 EAp2:Minimum Energy Performanceposted by Natalie Terrill on
Page 3 of the ASHRAE Lighting Compliance Documentation has a table for Interior Lighting Compliance Test for Additional Lighting which reads Total Additional Interior Lighting Power Allownace (Watt
Energy Modelling For Standarg G
NC-2009 EAc1:Optimize Energy Performanceposted by Mauricio Ramirez on
Hello. i have a doubt about this credit. We're working on a Children's Museum.
European Certificates accepted?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Nicole Isk on
Paints and coatings must meet the VOC limits defined by the SCAQMD Rule 1113 respectively the Green Seal Standards GS-11 and GC-03.
'Regularly occupied spaces' in LEED for Retail
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Anders Olson on
I am part of a new construction supermarket project that intends to seek certification under the LEED NC for Retail rating system.
Existing site
NC-2009 SSp1:Construction Activity Pollution Preventionposted by javier bolanos zeledon on
We are going to build an office space (5000ft2) within an industrial plant and will renovate completely and existing office building attached tho the industrial plant.