Driver's Toilets in a Core & Shell Building

CS-2009 WEp1:Water Use Reduction
posted by  Maya Karkour  on 

Hi, We are working on a luxurious Core & Shell Residential Building. The future tenants will decide on the water fixtures for their own flats/apartments.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Feb 15, 2011, 8:18 am

Minimum number required by local zoning regs

CI-2009 SSc3.3:Alternative Transportation—Parking Availability
posted by  Patricia Ewanski  on 

I'm not so savvy with how local zoning regs are worded. I did search for my city's local zoning regs and I'm not sure if what I found is it.

3
Director of Sustainability
Circuit of the Americas
LEEDuser Basic Member
14 thumbs up
Mon Feb 14, 2011, 11:04 pm

Submersible & Booster Pumps: Process equipment?

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear all, Should I model non-HVAC pumps such as "sewage submersible pumps" and "domestic water booster pumps" as process equipment? Thanks!

2
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Mon Feb 14, 2011, 1:06 pm

Graywater System

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Joseph Greene  on 

We have a graywater system in our building and I'm wondering if this would be subject to Fundamental Commissioning. Any thoughts?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Feb 11, 2011, 9:50 pm

can pavers around the green roof be counted as vegetated area?

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  yongmei gao  on 

Our project has green roof around 28,000sqf on the total 68,000 roof area , and 2 row of 2'x2' pavers area (9074sqf )at the roof perimeter.

4
Fri Feb 11, 2011, 6:49 pm

Staged Move in and Natural Ventilation

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Sam Keehn  on 

We are working on an office fit (3,800ft2) made up of basically 2 rooms. There have been some delays and the owner wants to move into one of the rooms while they finish the other.

3
Default Avatar
Environmental and Sustainability Manager
Energy Management Services, Int.
LEEDuser Basic Member
41 thumbs up
Thu Feb 10, 2011, 5:06 pm

Which Energy Price for a project outside the US

NC-2009 EAc1:Optimize Energy Performance
posted by  Tatjana Ernst  on 

Hi everyone, i am wondering if we can use the energy prices from the eia.doe.gov (US-Prices) although our project is in Europe? We don´t really understand the Site 273 of the Reference Guide.

2
Wed Feb 9, 2011, 2:59 pm

non-Cooling tower thinking

EBOM-2009 WEc4:Cooling Tower Water Management
posted by  Jean Marais  on 

How does the line of thought go that balances out not using cooling towers (e.g. air cooled chillers)? Is it bad to not use a cooling tower? is it good? does it balance out in the energy points?

4
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Feb 9, 2011, 1:24 pm

LEED boundary and materials scope

NC-2009 MRc4:Recycled Content
posted by  Janika McFeely  on 

A project we're working on is replacing some of the city sidewalk, which is outside our property line and LEED boundary. Should we include the concrete in our material calculations?

4
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Feb 9, 2011, 12:42 am

WEp1 - Substantial Completion Date

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  susan eguia  on 

As per WEp1 requirement, the water use baseline is set depending on the year of substantial completion of the building indoor plumbing system.

6
Default Avatar
ecoPreserve: Building Sustainability
LEEDuser Basic Member
101 thumbs up
Wed Feb 9, 2011, 12:23 am