Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

SSpc158 Feedback Survey errors

Pilot-Credits SSpc158:Onsite Carbon Sequestration Through Plantings
posted by  Courtney France  on 

FYI, or updates from others welcome if fixed online, Feedback Survey hosted through WUFOO for SSpc158 was errored.  Required responses for SSpc154 thru 158, even though project was not applica

1
Fri Aug 19, 2022, 12:21 am
3
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Tue Aug 16, 2022, 4:31 pm

Advanced Gas Meter and Submeter

NC-v4 EAc3:Advanced energy metering
posted by  Edgar Arevalo  on 

It's been pretty easy to find advanced electrical submeters that meet all the characteristics from LEED, but it's been such as challenge to find one for natura gas intake.

1
Tue Aug 16, 2022, 4:32 pm

v4.1 Schools Option 1 Path 2 Connected Site as an Alternative Compliance path in v4 BD&C New Construction

NC-v4.1 LTc4:Surrounding Density and Diverse Uses
posted by  Jerimiah Luckett  on 

Project is a City Transportation (Bus) Maintenance Facility, location is on the backside of an industrial area abutting a shipping/industrial railyard to the south and warehouses, industrial b

0

Product Categories

NC-v4.1 MRc4:Material Ingredients
posted by  Christoph Keck  on 

Hi everyone,

the project I am supporting at the moment is following the alternative international compliance path where we have to meet the 100ppm REACH criteria.

1
Wed Jun 14, 2023, 3:25 pm
2
Sustainability Manager
COWI
LEEDuser Premium Member
54 thumbs up
Tue Aug 16, 2022, 12:25 pm

REACH registration number

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Francesco Passerini  on 

In safety data sheets the calcium diformat is labeled with REACH registration number 01-2119486476-24-xxxx

7
Tue Aug 16, 2022, 12:33 am

Two unidentical buildings from same owner/management for what approach?

EBOM-v4 MPR2:Must use reasonable LEED boundaries
posted by  Eric Bautista  on 

I would like to emphasize the general details of this project for LEED v4 or v4.1 O+M certification.

0

Lighting control + color rendering requirements for v4.1

NC-v4.1 EQc6:Interior Lighting
posted by  Ashleigh Fischer  on 

Can anyone confirm if v4.1 requires color rendering / color fidelity index requirements to be met to achieve the Lighting Control option?   LEEDuser does not state this, but the credit la

4
Vice President
Moseley Architects
LEEDuser Premium Member
10 thumbs up
Sun Aug 14, 2022, 5:07 pm
2
Architect & Sustainability Leader
CannonDesign
LEEDuser Premium Member
4 thumbs up
Sat Aug 13, 2022, 1:23 pm