Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Imperil and Metric units?

NC-v4.1 MRc4:Material Ingredients
posted by  Kristi Merdler  on 

I have a project in Canada (metric units) but the client wants all documents in Imperial units. Is this a problem for LEED during the review process?

2
Sat Jan 15, 2022, 11:13 am

DOASs provide outdoor air to more than one tenant

CI-v4 EAc3:Advanced energy metering
posted by  CT G  on 

We're working on a project where the tenant occupies 2 floors in a 4 story-building. This building has DOAS units that supply OA to all 4 floors.

5
Fri Jan 14, 2022, 7:42 pm
3
Fri Jan 14, 2022, 5:36 pm

Concrete

NC-2009 MRc5:Regional materials
posted by  Steve Willey  on 

Is there anyway to calculate for cost per pound for cement, fly ash, limestone and sand

0

MR credids

NC-v4.1 MRc4:Material Ingredients
posted by  Kristi Merdler  on 

My project is using a pre-fabicated panel (walls and ceilings) inclusive of doors, windows and ceiling grid lights. All of these components are part of the panel design.

1
Thu Jan 13, 2022, 8:04 pm

ONSITE RENEWABLE ENERGY FOR PREREQUISITE

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Jorge Lopez de Obeso  on 

Is it possible to meet the Prerequisite and Credit with onsite renewable energy under V4.1 ? 

6
Principal
ME Engineers
LEEDuser Premium Member
30 thumbs up
Wed Jan 12, 2022, 7:03 pm

Non default use time for lavatory faucets

NC-v4 WEc2:Indoor water use reduction
posted by  Ruju Rathod  on 

 We would like to use a non default lavatory faucet duration of 15 seconds instead of the 30 seconds. 

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Wed Jan 12, 2022, 5:46 pm

Frit: Views versus Bird collision deterrence

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Kath Williams  on 

Following design decisions, our team discovered the frit pattern chosen to deter bird collision ultimately interfered with obtaining Views credit.

0