Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

TVOC overall concentration doesn't pass but individual TVOC compounds do pass

NC-v4 EQc4:Indoor air quality assessment
posted by  Valerie Johnston  on 

All of the individual VOC compounds in all sampling locations have passed the LEED criteria.

1
Wed Feb 9, 2022, 2:53 pm

IAQ Documentation with Corrective Action

NC-v4 EQc3:Construction indoor air quality management plan
posted by  Juanita Garcia  on 

My project team puts together reports that includes pictures of conditions that to be addressed with SMACNA Control measures and includes photos of corrected conditions.

1
Mon Dec 6, 2021, 11:20 am

MERV 8 upstream cooling coils

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Paula Hernandez  on 

Hi,

We are working in an EBOM v4.1 project. I have one question.

2
Thu Oct 14, 2021, 10:19 am

Fasteners and Misc Materials

NC-2009 MRc4:Recycled Content
posted by  Robert Fiala  on 

To what extent are fasteners and miscellaneous materials expected to be included in Materials & Resources calculations?

6
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Oct 13, 2021, 10:12 pm
6
Project Director
Sustainable Design Consulting
LEEDuser Expert
27 thumbs up
Wed Oct 13, 2021, 4:47 pm

ASHRAE 90.1 2010 versus ASHRAE 90.1 2016

NC-v4 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

LEED v4.1 allows onsite renewables to contribute to EAp Minimum Energy Performance and offsite Tier 2 renewables to contribute to EAc Optimize Energy Performance. 

6
Principal
ME Engineers
LEEDuser Premium Member
29 thumbs up
Wed Oct 13, 2021, 1:42 pm

IS "WELL WATER" AN "ALTERNATIVE WATER SOURCE"?

NC-v4 WEc1:Outdoor water use reduction
posted by  F. Borja López Calle  on 

We have a project whose landscape meets the prerequisite “WE Outdoor Water Use Reduction” (it consumes 30% less water than the base case).

3
Wed Oct 13, 2021, 1:21 pm

Exterior Wall Continuous Insulation - Formaldehyde-Free Requirements/Certifications

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Catherine Blakemore  on 

I have a project that has a large amount of curtain wall.  Where the glazing is opaque, the curtain wall will be covered by continuous foil-faced, mineral wool board insulation.  None of

0
8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 12, 2021, 2:15 pm