Forum quick links
Material Ingredient Screening/Action Plan
NC-v4.1 MRc4:Material Ingredientsposted by Brianne Grace on
I'm grasping for one last point here.
Modeling Occupancy Sensors for lighting
NC-v4.1 EAp2:Minimum Energy Performanceposted by Saif Alsaeed on
I am working on a 90.1-2016 App G energy model. The schedules in ASHRAE 90.1 User’s Manual indicates that the lighting schedule reflects mandatory occupancy sensors requirements of section 9.4.
Grass area may become a future parking lot.
NC-v4.1 WEp1:Outdoor Water Use Reductionposted by Don Wheeler on
When determining baseline calculations, I know not to include any aggregate areas.
ENERGY STAR Appliances & Equipment Required for Federal Project
CI-v4 EAp2:Minimum energy performanceposted by David Hryvniak on
We are working on a project that is owned by the Federal Government. By law, all newly purchased equipment that is eligible must be ENERGY STAR certified.
Source for Table 1 Maximum Parameters
NC-v4 WEc3:Cooling tower water useposted by Nathan Gauthier on
Does anybody know where USGBC / WE TAG came up with Table 1? I've not been able to find it anywhere, except where it is referenced as coming from LEED.
0.5 PPB above threshold
NC-v4 EQc4:Indoor air quality assessmentposted by Omar Elrawy on
Dear all,
Our IAQ test results show compliance for all parameters except for Fromaldehyde, which is 27.50 PPB , meaning that it is only 0.50 PPB above the threshold.
Marquee sign to be provided at a later time
NC-v4 SSc6:Light pollution reductionposted by Tacy Austin on
The marquee sign is shown on our site plans but the intention is to install at a later date. To receive this credit, what is the best way to document this?
How to calculate "Area with Direct Line of Sight to the Outdoors via Vision Glazing" without a 90 degree angle?
NC-v4 EQc8:Quality viewsposted by Elissa Wu on
I am working on a project that has two regularly occupied spaces that do NOT have two 90 degree apart windows. I am instead going for Type 2 and Type 4.
Cooling tower cycles
NC-v4 WEc3:Cooling tower water useposted by Manuel Martin Delgado on
Hi, I am a bit confused with the credit requirements for achieving 1 point.
White Box Condominium Spaces
NC-2009 PIf3:Occupant and Usage Dataposted by Kevin Mowatt on
For the purposes of defining the regularly occupied GSF and related credits under IEQ, we are trying to determine how allocate several condo units that will remain as a "white box" for our LEED sub