Does the paring now have to be on-site?
CS-v4.1 LTc8:Electric Vehiclesposted by Maria Porter on
I have had many projects in v2009 that have had their parking in a neighboring garage if they don’t have their own garage. I have ongoing projects in v4 with the same situation.
Do toilet rooms count as non-regularly occupied spaces?
Pilot-Credits EQpc116:Daylight in nonregularly occupied spacesposted by Kristian Kicinski on
We are considering this credit for a large high school. We have some large toilet room areas and are wondering if these fall into the "non-regularly occupied" or "unoccupied category".
Written Commitment from the Owner
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Laura Heagler on
Our project is registered under LEED v4 BD+C.
Flushing Out a Hockey Rink
NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
My project is a new construction hockey arena pursuing Option 1, Path 1 for the flush out. The thing is, we have ice. Ambient temperatures will not be above 60 degrees.
Can we pursue both Path 1 and Path 2
NC-v4.1 LTc5:Access to Quality Transitposted by Jyothsna Giridhar on
Am I correct in my interpretation that we cannot include campus shuttles as well as public transit? Does it have to be either one or both can be counted?
V4 Entrance mats/roll-up mats
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Kathryn Haeberle on
Hi, does anyone know if the v2009 interpretation still applies that the first 3 ft of the 10 ft must be a permanent system (like recessed mat system) and the remainder can be roll-up mats
ASHRAE 90.1 - 2016 Mandatory Requirements, Submetering
NC-v4.1 EAp2:Minimum Energy Performanceposted by Parker Hall on
Can you please check my logic and confirm if submetering is required on all LEED v4.1 BD+C projects?
MPR2 LEEDuser Forum questions and comments prior to the 09/05/17 upgrade
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Brian Bartholomew on
Did we lose access to all the MPR2 LEEDuser Forum questions and comments posted prior to the 09/05/17 upgrade?
University Participation in Utility Solar
NC-v4 EAc7:Green power and carbon offsetsposted by Rebecca Aarons-Sydnor on
We are working on a new building at a University that has an existing agreement with the utility to offset 96% of the energy used with utlity-owned solar farms, and all RECs are retired on the Univ
EU Special Area of Conservation - ACP?
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Devyn Olson Sawyer on
Our project is located in the west of Ireland. The project is a warehouse extension (a single LEED project) on an existing commercial campus, and the entire campus is the same owner/occupier.