Universal-access natural trails available to visitors, staff, or patients may account for no more than 30% of required area
Healthcare-v4 SSc7:Places of respiteposted by Cristina Bontia on
If a regional trail accessible to all is within the 200ft limit, Can this be applied to both the 2% dedicated staff requirement AND the 5% required for patients and visitors?
VOC content for wet applied adhesive
NC-v4 EQc2:Low emitting materialsposted by Muhammad Mahasneh on
Hello,
we are evaluating an onsite wet-applied adhesive that has report of VOC content measured in accordance to ISO 11890-2.
Legal Wood ACP for LEED O+M
Pilot-Credits MRpc102:Legal Woodposted by Joshua Chia on
Has anyone tried to attempt this pilot credit for LEED O+M: Existing Buildings? Am targeting this credit for Green Cleaning Products that are PEFC certified.
Solar Panels
NC-2009 EAc2:On-Site Renewable Energyposted by Paula Hernandez on
Hello, I am working on a Project that wants to claim all the available points on EA-c2.
Building as a teaching tool
NC-v4.1 INc1:Innovationposted by Jon Penndorf on
For a building that is not a K-12 school, can we still pursue the credit for Building as a Teaching Tool using the old credit interpretation? Summarized below.
how to classify our site?
NC-v4.1 SSc2:Protect or Restore Habitatposted by Aynaz Alaei on
Hi,
Does open grass area that was previously re-graded (decades ago) to slope to a man made stormwater retention pond count as greenfield, or is this previously disturbed?
Entryway systems
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by K Pomperada on
Our project is an office building already being occupied by tenants, and the entryway system measures only 9 ft. lacking 1ft from the requirement by LEED.
Chlorine as a biocide treatment
NC-v4.1 WEc3:Optimize Process Water Useposted by Ricardo Sá on
Dear All